If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454070210002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.853265,"lon":-110.906215,"icon":""}]} |
Location: 00/10-02-045-07W4/2 | |
Location Alias: 00/10-02-45-07 W4M | |
Location Alias 2: 00/10-02-045-07 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 07 | |
Section: 02 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: CLEO ENERGY WAINWR 10-2-45-7 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0082821 | |
License Date: 1980-05-15 | |
License Status: Issued | |
Spud Date: 1980-07-29 | |
Final Drill Date: 1980-08-01 | |
Well Total Depth: 735.00 m | |
Surface Hole Latitude: 52.853265 | |
Surface Hole Longitude: -110.906215 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-05-15 | Obtained License |
1980-08-01 | Finished Drilling |
1980-08-01 | Well Mode changed to Drilled and Cased |
1980-08-03 | Drill Stem Test Performed |
1980-08-04 | Drill Stem Test Performed |
1980-08-05 | Production Casing Operation Performed |
1981-10-30 | Perforation Treatment Performed - Jet Perforation |
1981-11-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-11-02 | Perforation Treatment Performed - Cement Squeeze |
1981-11-05 | Perforation Treatment Performed - Jet Perforation |
1984-05-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-05-14 | Perforation Treatment Performed - Jet Perforation |
1984-05-16 | Well Began Production |
1984-05-16 | Well Fluid changed to Gas |
1984-05-16 | Well Mode changed to Flowing |
1986-04-01 | Well Fluid changed to Gas |
1986-04-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-10-30 | Perforation | 602.00 | 603.00 | 7 |
1981-11-02 | Acid Treatment | 602.00 | 603.00 | 0 |
1981-11-02 | Cement Squeeze | 602.00 | 603.00 | 0 |
1981-11-05 | Perforation | 586.00 | 587.50 | 13 |
1984-05-10 | Acid Treatment | 586.00 | 587.50 | 0 |
1984-05-14 | Perforation | 628.00 | 629.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 2836 | 0.0 | 0.0 | 0.0 |
1985 | 168 | 0.0 | 0.0 | 0.0 |
For data sources see[5]