X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454063413B00

Well Details

Well ID: 0454063413B00
Loading map...
Location: B0/13-34-045-06W4/0
Location Alias: B0/13-34-45-06 W4M
Location Alias 2: B0/13-34-045-06 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 06
Section: 34
County/Municipality: Municipal District of Wainwright No. 61
Well Name: SURGE ENERGY WAINWR 13-34-45-6
Operator Name: Surge Energy Inc.
License Number: 0035130
License Date: 1968-11-06
License Status: Issued
Spud Date: 1968-12-14
Final Drill Date: 1968-12-17
Well Total Depth: 672.10 m
Surface Hole Latitude: 52.927863
Surface Hole Longitude: -110.800317

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-11-06 Obtained License
1968-12-17 Finished Drilling
1968-12-18 Drill Stem Test Performed
1968-12-19 Perforation Treatment Performed - Acid Wash - No Pressure
1968-12-19 Perforation Treatment Performed - Jet Perforation
1968-12-19 Production Casing Operation Performed
1969-05-29 Well Mode changed to Drilled and Cased
1973-01-27 Perforation Treatment Performed - Cement Squeeze
1973-07-20 Perforation Treatment Performed - Jet Perforation
1973-08-01 Well Began Production
1973-08-01 Well Fluid changed to Crude Oil
1973-08-01 Well Mode changed to Pumping
1973-10-15 Well Fluid changed to Crude Oil
1973-10-15 Well Mode changed to Suspended
1977-08-28 Perforation Treatment Performed - Fractured
1977-09-23 Well Fluid changed to Crude Oil
1977-09-23 Well Mode changed to Pumping
1978-01-14 Well Fluid changed to Crude Oil
1978-01-14 Well Mode changed to Suspended
1978-05-30 Well Fluid changed to Crude Oil
1978-05-30 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-12-19 Perforation 129.50 147.80 7
1968-12-19 Acid Wash 129.50 147.80 0
1973-01-27 Cement Squeeze 129.50 147.80 0
1973-07-20 Perforation 646.80 649.20 7
1977-08-28 Fracture 646.80 649.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 96 0.0 0.0 0.0
1977 2832 0.0 0.0 0.0
1978 5432 0.0 0.0 0.0
1979 7887 0.0 0.0 0.0
1980 6621 0.0 0.0 0.0
1981 6339 0.0 0.0 0.0
1982 8261 0.0 0.0 0.0
1983 8639 0.0 0.0 0.0
1984 8564 0.0 0.0 0.0
1985 8305 0.0 0.0 0.0
1986 3654 0.0 0.0 0.0
1987 8611 0.0 0.0 0.0
1988 8362 0.0 0.0 0.0
1989 8328 0.0 0.0 0.0
1990 8650 0.0 0.0 0.0
1991 8661 0.0 0.0 0.0
1992 8700 0.0 0.0 0.0
1993 8262 0.0 0.0 0.0
1994 8604 0.0 0.0 0.0
1995 8386 0.0 0.0 0.0
1996 8333 0.0 0.0 0.0
1997 8609 0.0 0.0 0.0
1998 8678 0.0 0.0 0.0
1999 8728 0.0 0.0 0.0
2000 8660 0.0 0.0 0.0
2001 8541 0.0 0.0 0.0
2002 8754 0.0 0.0 0.0
2003 8691 0.0 0.0 0.0
2004 8752 0.0 0.0 0.0
2005 8085 0.0 0.0 0.0
2006 8621 0.0 0.0 0.0
2007 7876 0.0 0.0 0.0
2008 8588 0.0 0.0 0.0
2009 8649 0.0 0.0 0.0
2010 8669 0.0 0.0 0.0
2011 8569 0.0 0.0 0.0
2012 8752 0.0 0.0 0.0
2013 8741 0.0 0.0 0.0
2014 8503 0.0 0.0 0.0
2015 8721 0.0 0.0 0.0
2016 8748 0.0 0.0 0.0
2017 8600 0.0 0.0 0.0
2018 8111 0.0 0.0 0.0
2019 8210 0.0 0.0 0.0
2020 1990 0.0 0.0 0.0

For data sources see[5]

References