X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454062411D00

Well Details

Well ID: 0454062411D00
Loading map...
Location: D0/11-24-045-06W4/0
Location Alias: D0/11-24-45-06 W4M
Location Alias 2: D0/11-24-045-06 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 06
Section: 24
County/Municipality: Municipal District of Wainwright No. 61
Well Name: SURGE ENERGY WAINWR 11-24-45-6
Operator Name: Surge Energy Inc.
License Number: 0054695
License Date: 1975-08-26
License Status: Suspension
Spud Date: 1975-08-30
Final Drill Date: 1975-09-02
Well Total Depth: 668.10 m
Surface Hole Latitude: 52.897240
Surface Hole Longitude: -110.743605

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-08-26 Obtained License
1975-08-30 Lost Circulation Occurred
1975-09-02 Finished Drilling
1975-09-02 Well Mode changed to Drilled and Cased
1975-09-03 Production Casing Operation Performed
1975-09-16 Perforation Treatment Performed - Jet Perforation
1975-09-17 Perforation Treatment Performed - Fractured
1975-09-25 Well Began Production
1975-09-25 Well Fluid changed to Crude Oil
1975-09-25 Well Mode changed to Pumping
1987-08-01 Well Fluid changed to Crude Oil
1987-08-01 Well Mode changed to Suspended
1994-11-07 Perforation Treatment Performed - Jet Perforation
1994-11-07 Well Fluid changed to Crude Oil
1994-11-07 Well Log Performed
1994-11-07 Well Mode changed to Suspended
1994-11-08 Perforation Treatment Performed - Jet Perforation
1994-11-08 Well Log Performed
1996-03-12 Perforation Treatment Performed - Cement Squeeze
1996-03-16 Well Log Performed
1996-03-17 Perforation Treatment Performed - Jet Perforation
1996-03-18 Well Log Performed
1996-05-15 Well Began Injection
1996-05-15 Well Fluid changed to Water
1996-05-15 Well Type changed to Injection
2014-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-10-03 Plug Back Performed
2014-10-03 Well Fluid changed to Water
2014-10-03 Well Mode changed to Abandoned Zone
2014-10-03 Well Type changed to Injection
2014-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-10-04 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-16 Perforation 640.40 641.90 7
1975-09-17 Fracture 640.40 641.90 0
1994-11-07 Perforation 599.20 601.70 20
1994-11-08 Perforation 554.40 560.20 20
1996-03-12 Cement Squeeze 554.50 560.20 0
1996-03-17 Perforation 640.40 643.70 14
2014-10-03 Packing Device Capped w/Cement 627.50 635.50 0
2014-10-03 Packing Device Capped w/Cement 588.00 596.00 0
2014-10-04 Packing Device Capped w/Cement 541.00 549.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 1488 0.0 0.0 0.0
1976 4100 0.0 0.0 0.0
1977 8369 0.0 0.0 0.0
1978 8504 0.0 0.0 0.0
1979 8723 0.0 0.0 0.0
1980 8587 0.0 0.0 0.0
1981 8633 0.0 0.0 0.0
1982 8485 0.0 0.0 0.0
1983 8609 0.0 0.0 0.0
1984 8622 0.0 0.0 0.0
1985 8661 0.0 0.0 0.0
1986 8717 0.0 0.0 0.0
1987 4514 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1975-08-30 Lost Circulation 42.70 42.70
2014-10-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References