X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454042812000

Well Details

Well ID: 0454042812000
Loading map...
Location: 00/12-28-045-04W4/0
Location Alias: 00/12-28-45-04 W4M
Location Alias 2: 00/12-28-045-04 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 04
Section: 28
County/Municipality: Municipal District of Wainwright No. 61
Well Name: ALBERMONT EDGERTON 12-28-45-4
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0005050
License Date: 1952-07-24
License Status: RecExempt
Spud Date: 1952-09-01
Final Drill Date: 1952-09-15
Well Total Depth: 783.30 m
Surface Hole Latitude: 52.910773
Surface Hole Longitude: -110.532902

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-07-24 Obtained License
1952-09-08 Drill Stem Test Performed
1952-09-10 Drill Stem Test Performed
1952-09-13 Drill Stem Test Performed
1952-09-15 Drill Stem Test Performed
1952-09-15 Finished Drilling
1952-09-15 Well Mode changed to Drilled and Cased
1952-09-16 Drill Stem Test Performed
1952-09-17 Production Casing Operation Performed
1952-09-21 Perforation Treatment Performed - Jet Perforation
1952-09-22 Perforation Treatment Performed - Cement Squeeze
1952-09-24 Perforation Treatment Performed - Jet Perforation
1952-10-03 Well Began Production
1952-10-03 Well Fluid changed to Crude Oil
1952-10-03 Well Mode changed to Pumping
1952-12-12 Perforation Treatment Performed - Cement Squeeze
1953-01-26 Perforation Treatment Performed - Jet Perforation
1954-07-22 Perforation Treatment Performed - Cement Plug
1954-07-22 Well Abandoned
1954-07-22 Well Fluid changed to Crude Oil
1954-07-22 Well Mode changed to Abandoned
1988-06-14 Well Log Performed
1988-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-06-15 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-09-21 Perforation 649.50 650.40 26
1952-09-22 Cement Squeeze 649.50 650.40 0
1952-09-24 Perforation 641.60 645.00 10
1952-09-24 Perforation 645.90 648.30 10
1952-12-12 Cement Squeeze 641.60 648.30 0
1953-01-26 Perforation 644.00 645.00 10
1954-07-22 Cement Plug 626.40 641.60 0
1988-06-15 Packing Device Capped w/Cement 627.00 635.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References