X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454042502002

Well Details

Well ID: 0454042502002
Loading map...
Location: 00/02-25-045-04W4/2
Location Alias: 00/02-25-45-04 W4M
Location Alias 2: 00/02-25-045-04 W4/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 04
Section: 25
County/Municipality: Municipal District of Wainwright No. 61
Well Name: BLACK SHIRE EDGER 2-25-45-4
Operator Name: Twin Butte Energy Ltd.
License Number: 0086522
License Date: 1980-10-22
License Status: RecCertified
Spud Date: 1980-10-28
Final Drill Date: 1980-11-03
Well Total Depth: 725.00 m
Surface Hole Latitude: 52.904619
Surface Hole Longitude: -110.446908

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-22 Obtained License
1980-11-03 Finished Drilling
1980-11-03 Well Mode changed to Drilled and Cased
1980-11-04 Drill Stem Test Performed
1980-11-05 Production Casing Operation Performed
1981-07-29 Perforation Treatment Performed - Jet Perforation
1982-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-01-27 Perforation Treatment Performed - Jet Perforation
1982-02-01 Well Began Production
1982-02-01 Well Fluid changed to Gas
1982-02-01 Well Mode changed to Flowing
1982-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-26 Plug Back Performed
2000-09-26 Well Log Performed
2000-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-28 Perforation Treatment Performed - Jet Perforation
2000-09-28 Perforation Treatment Performed - Remedial Casing
2000-09-28 Well Log Performed
2000-10-03 Well Abandoned
2000-10-03 Well Fluid changed to Gas
2000-10-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-07-29 Perforation 700.00 704.00 13
2000-09-28 Remedial Casing Cementing 125.00 125.30 0
2000-09-28 Packing Device Capped w/Cement 115.00 123.00 0
1982-01-27 Packing Device Capped w/Cement 689.00 697.00 0
1982-01-27 Perforation 611.50 614.00 13
1982-03-29 Acid Treatment 611.50 614.00 0
2000-09-26 Packing Device Capped w/Cement 592.00 600.00 0
2000-09-28 Perforation 190.00 190.30 99
2000-09-28 Remedial Casing Cementing 190.00 190.30 0
2000-09-28 Packing Device Capped w/Cement 180.00 188.00 0
2000-09-28 Perforation 125.00 125.30 99

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 3277 0.0 0.0 0.0
1983 6472 0.0 0.0 0.0
1984 5082 0.0 0.0 0.0
1985 4879 0.0 0.0 0.0
1986 5182 0.0 0.0 0.0
1987 3593 0.0 0.0 0.0
1988 3229 0.0 0.0 0.0
1989 5708 0.0 0.0 0.0
1990 7319 0.0 0.0 0.0
1991 7164 0.0 0.0 0.0
1992 6601 0.0 0.0 0.0
1993 7695 0.0 0.0 0.0
1994 5785 0.0 0.0 0.0
1995 271 0.0 0.0 0.0

For data sources see[5]

References