X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445152508004

Well Details

Well ID: 0445152508004
Loading map...
Location: 00/08-25-044-15W5/4
Location Alias: 00/08-25-44-15 W5M
Location Alias 2: 00/08-25-044-15 W5/04
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 15
Section: 25
County/Municipality: Clearwater County
Well Name: FAIRBORNE COLUMBIA 8-25-44-15
Operator Name: Tourmaline Oil Corp.
License Number: 0323691
License Date: 2005-01-10
License Status: Issued
Spud Date: 2005-02-19
Final Drill Date: 2005-03-20
Well Total Depth: 3340.00 m
Surface Hole Latitude: 52.818896
Surface Hole Longitude: -116.038513

For data sources see[1][2]

Well History

Date Event
2005-01-10 Obtained License
2005-02-22 Surface Casing Operation Performed
2005-03-06 Well Log Performed
2005-03-08 Intermediate Casing Operation Performed
2005-03-19 Well Log Performed
2005-03-20 Finished Drilling
2005-03-20 Well Mode changed to Drilled and Cased
2005-03-21 Well Log Performed
2005-03-23 Liner Casing Operation Performed
2005-03-26 Rig Released
2005-07-22 Well Log Performed
2005-07-30 Perforation Treatment Performed - Jet Perforation
2005-07-30 Well Log Performed
2005-08-04 Well Log Performed
2005-08-08 Perforation Treatment Performed - Fractured
2005-08-13 Well Log Performed
2005-08-14 Perforation Treatment Performed - Jet Perforation
2005-08-14 Well Log Performed
2005-08-17 Perforation Treatment Performed - Cement Squeeze
2005-08-17 Plug Back Performed
2005-08-21 Well Log Performed
2005-08-25 Perforation Treatment Performed - Jet Perforation
2005-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-10 Plug Back Performed
2005-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-18 Plug Back Performed
2005-09-18 Well Log Performed
2008-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-12 Perforation Treatment Performed - Jet Perforation
2008-03-12 Plug Back Performed
2008-03-12 Well Log Performed
2008-03-15 Perforation Treatment Performed - Fractured
2008-04-16 Well Began Production
2008-04-16 Well Fluid changed to Gas
2008-04-16 Well Mode changed to Flowing
2016-04-01 Well Fluid changed to Gas
2016-04-01 Well Mode changed to Suspended
2016-09-29 Well Fluid changed to Gas
2016-09-29 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-07-30 Perforation 3287.00 3292.00 17
2008-03-15 Fracture 2787.00 2790.00 0
2005-08-08 Fracture 3287.00 3292.00 0
2005-08-14 Perforation 3119.00 3123.00 17
2005-08-17 Cement Squeeze 3119.00 3123.00 0
2005-08-25 Perforation 2867.00 2872.00 17
2005-09-10 Packing Device Capped w/Cement 3270.80 3280.00 0
2005-09-18 Packing Device Capped w/Cement 3094.60 3105.00 0
2008-03-12 Packing Device Capped w/Cement 2852.00 2860.00 0
2008-03-12 Perforation 2787.00 2790.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 3323 0.0 0.0 0.0
2009 7252 0.0 0.0 0.0
2010 5023 0.0 0.0 0.0
2011 2697 0.0 0.0 0.0
2012 1059 0.0 0.0 0.0
2016 1145 0.0 0.0 0.0
2017 7245 0.0 0.0 0.0
2018 1931 0.0 0.0 0.0
2019 848 0.0 0.0 0.0
2020 504 0.0 0.0 0.0

For data sources see[5]

References