If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0445150212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.757539,"lon":-116.052607,"icon":""}]} |
Location: 00/12-02-044-15W5/0 | |
Location Alias: 00/12-02-44-15 W5M | |
Location Alias 2: 00/12-02-044-15 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 5 | |
Range: 15 | |
Section: 02 | |
County/Municipality: Clearwater County | |
Well Name: TOURMALINE HZ COLUMBIA 12-2-44-15 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0475885 | |
License Date: 2015-06-24 | |
License Status: Issued | |
Spud Date: 2015-09-03 | |
Final Drill Date: 2015-09-27 | |
Well Total Depth: 5056.00 m | |
Surface Hole Latitude: 52.757539 | |
Surface Hole Longitude: -116.052607 |
Date | Event |
---|---|
2015-06-24 | Obtained License |
2015-09-05 | Surface Casing Operation Performed |
2015-09-08 | Lost Circulation Occurred |
2015-09-11 | Intermediate Casing Operation Performed |
2015-09-11 | Well Log Performed |
2015-09-15 | Direction Drilling Operation Performed - Deviate |
2015-09-18 | Direction Drilling Operation Performed - Horizontal |
2015-09-18 | Well Log Performed |
2015-09-27 | Finished Drilling |
2015-09-27 | Well Mode changed to Drilled and Cased |
2015-09-28 | Well Log Performed |
2015-10-01 | Production Casing Operation Performed |
2015-10-05 | Rig Released |
2015-10-18 | Well Log Performed |
2015-10-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-10-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-10-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-10-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-10-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-10-24 | Well Began Production |
2015-10-24 | Well Fluid changed to Gas |
2015-10-24 | Well Mode changed to Flowing |
2015-10-28 | Well Log Performed |
2015-10-31 | Well Log Performed |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-09-03 | Patterson-UTI Drilling Co. Canada | 14E | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-09-15 | 2923.40 | Deviate (5 - 79 degrees) |
2015-09-18 | 3405.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-10-21 | Multi-Stage Fracture | 5009.50 | 5009.60 | 0 |
2015-10-23 | Multi-Stage Fracture | 4504.50 | 4504.60 | 0 |
2015-10-23 | Multi-Stage Fracture | 4439.10 | 4439.20 | 0 |
2015-10-23 | Multi-Stage Fracture | 4373.30 | 4373.40 | 0 |
2015-10-23 | Multi-Stage Fracture | 4307.40 | 4307.50 | 0 |
2015-10-23 | Multi-Stage Fracture | 4241.60 | 4241.70 | 0 |
2015-10-23 | Multi-Stage Fracture | 4175.80 | 4175.90 | 0 |
2015-10-23 | Multi-Stage Fracture | 4110.00 | 4110.10 | 0 |
2015-10-23 | Multi-Stage Fracture | 4044.20 | 4044.30 | 0 |
2015-10-23 | Multi-Stage Fracture | 3978.40 | 3978.50 | 0 |
2015-10-23 | Multi-Stage Fracture | 3912.60 | 3912.70 | 0 |
2015-10-21 | Acid Treatment | 5009.50 | 5009.60 | 0 |
2015-10-23 | Multi-Stage Fracture | 3846.70 | 3846.80 | 0 |
2015-10-23 | Multi-Stage Fracture | 3780.90 | 3781.00 | 0 |
2015-10-24 | Multi-Stage Fracture | 3715.40 | 3715.50 | 0 |
2015-10-24 | Multi-Stage Fracture | 3650.20 | 3650.30 | 0 |
2015-10-24 | Multi-Stage Fracture | 3584.50 | 3584.60 | 0 |
2015-10-24 | Multi-Stage Fracture | 3519.00 | 3519.10 | 0 |
2015-10-22 | Multi-Stage Fracture | 4964.40 | 4964.50 | 0 |
2015-10-22 | Multi-Stage Fracture | 4898.60 | 4898.70 | 0 |
2015-10-22 | Multi-Stage Fracture | 4832.70 | 4832.80 | 0 |
2015-10-22 | Multi-Stage Fracture | 4767.70 | 4767.80 | 0 |
2015-10-22 | Multi-Stage Fracture | 4701.90 | 4702.00 | 0 |
2015-10-22 | Multi-Stage Fracture | 4636.10 | 4636.20 | 0 |
2015-10-23 | Multi-Stage Fracture | 4570.30 | 4570.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-10-21 | 2015-10-24 | 3,236 | 6,537 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 85.3321 | N/A | |||
Prime Plus 40/70 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 3.0625 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 3.0625 | N/A | ||||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 9.4682 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.7803 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0106 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0106 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0106 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0106 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0106 | N/A | ||||
CC-55 | Trican | Clay Control | 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide | 7744 | 100 | 0.1868 | N/A | |
formic acid | 64-18-6 | 100 | 0.1868 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.1868 | N/A | ||||
FR-9 | Trican | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.0887 | N/A | |
alcohols. C12-14. ethoxylated | 68439-50-9 | 100 | 0.0887 | N/A | ||||
alcohols. C12-16. ethoxylated | 68551-12-2 | 100 | 0.0887 | N/A | ||||
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0887 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0887 | N/A | ||||
S-2 | Trican | Surfactant | 2-ethylhexanol | 104-76-7 | 100 | 0.0703 | N/A | |
isopropanol | 67-63-0 | 100 | 0.0703 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0703 | N/A | ||||
oxydiethylenebis(alkyldimethyl ammonium chloride) | 68607-28-3 | 100 | 0.0703 | N/A | ||||
solvent naphtha (petroleum). heavy aromatic | 64742-94-5 | 100 | 0.0703 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-10-14 | 2015-10-26 | Recycled Fracturing Water (treated at well site) | 2147 |
2015-10-20 | 2015-10-23 | Surface Water - River | 3763 |
2015-10-22 | 2015-10-24 | Recycled Fracturing Water (treated at well site) | 627 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 1507 | 0.0 | 0.0 | 0.0 |
2016 | 8781 | 0.0 | 0.0 | 0.0 |
2017 | 8732 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8677 | 0.0 | 0.0 | 0.0 |
2020 | 2135 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-09-08 | Lost Circulation | 1977.00 | 2250.00 |
2015-11-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]