X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445143105020

Well Details

Well ID: 0445143105020
Loading map...
Location: 02/05-31-044-14W5/0
Location Alias: 02/05-31-44-14 W5M
Location Alias 2: 02/05-31-044-14 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 14
Section: 31
County/Municipality: Clearwater County
Well Name: TOURMALINE 102 HZ BRAZR 5-31-44-14
Operator Name: Tourmaline Oil Corp.
License Number: 0478874
License Date: 2016-01-22
License Status: Amended
Spud Date: 2016-07-14
Final Drill Date: 2016-09-19
Well Total Depth: 4657.00 m
Surface Hole Latitude: 52.829072
Surface Hole Longitude: -116.006250

For data sources see[1][2]

Well History

Date Event
2016-01-22 Obtained License
2016-07-16 Surface Casing Operation Performed
2016-07-26 Intermediate Casing Operation Performed
2016-09-06 Direction Drilling Operation Performed - Deviate
2016-09-08 Direction Drilling Operation Performed - Horizontal
2016-09-18 Well Log Performed
2016-09-19 Finished Drilling
2016-09-19 Well Mode changed to Drilled and Cased
2016-09-22 Production Casing Operation Performed
2016-09-22 Rig Released
2016-09-27 Well Log Performed
2016-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-05 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-17 Well Began Production
2016-10-17 Well Fluid changed to Gas
2016-10-17 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-07-14 Horizon Drilling Inc. 55 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-09-06 2700.30 Deviate (5 - 79 degrees)
2016-09-08 3080.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-09-30 Multi-Stage Fracture 4605.30 4605.40 0
2016-10-04 Multi-Stage Fracture 4140.60 4140.70 0
2016-10-04 Multi-Stage Fracture 4087.70 4087.80 0
2016-10-04 Multi-Stage Fracture 4034.80 4034.90 0
2016-10-04 Multi-Stage Fracture 3981.90 3982.00 0
2016-10-04 Multi-Stage Fracture 3929.00 3929.10 0
2016-10-04 Multi-Stage Fracture 3876.50 3876.60 0
2016-10-04 Multi-Stage Fracture 3823.60 3823.70 0
2016-10-04 Multi-Stage Fracture 3770.60 3770.70 0
2016-10-04 Multi-Stage Fracture 3718.30 3718.40 0
2016-10-04 Multi-Stage Fracture 3665.60 3665.70 0
2016-10-03 Multi-Stage Fracture 4563.50 4563.60 0
2016-10-04 Multi-Stage Fracture 3613.40 3613.50 0
2016-10-04 Multi-Stage Fracture 3560.80 3560.90 0
2016-10-04 Multi-Stage Fracture 3508.00 3508.10 0
2016-10-05 Multi-Stage Fracture 3455.60 3455.70 0
2016-10-05 Multi-Stage Fracture 3402.90 3403.00 0
2016-10-05 Multi-Stage Fracture 3350.50 3350.60 0
2016-10-05 Multi-Stage Fracture 3297.60 3297.70 0
2016-10-05 Multi-Stage Fracture 3245.30 3245.40 0
2016-10-05 Multi-Stage Fracture 3193.00 3193.10 0
2016-10-05 Multi-Stage Fracture 3140.80 3140.90 0
2016-10-03 Multi-Stage Fracture 4510.50 4510.60 0
2016-10-04 Multi-Stage Fracture 4457.60 4457.70 0
2016-10-04 Multi-Stage Fracture 4404.70 4404.80 0
2016-10-04 Multi-Stage Fracture 4351.80 4351.90 0
2016-10-04 Multi-Stage Fracture 4299.00 4299.10 0
2016-10-04 Multi-Stage Fracture 4246.20 4246.30 0
2016-10-04 Multi-Stage Fracture 4193.50 4193.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-09-30 2016-10-05 2,952 7,021 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.7778 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.4148 N/A
silica crystalline 14808-60-7 100 3.4148 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 11.9423 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.6398 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0103 N/A
2-mercaptoethanol 60-24-2 100 0.0103 N/A
dibromoacetonitrile 3252-43-5 100 0.0103 N/A
non-hazardous ingredients Not Available 100 0.0103 N/A
sodium bromide 7647-15-6 100 0.0103 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.089 N/A
water Not Available 100 0.089 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.086 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.086 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.086 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.086 N/A
non-hazardous ingredients Not Available 100 0.086 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0397 N/A
methanol 67-56-1 100 0.0397 N/A
water Not Available 100 0.0397 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-10-02 2016-10-05 Surface Water - River 7000
2016-10-04 2016-10-05 Recycled Fracturing Water (treated at well site) 22

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 1870 0.0 0.0 0.0
2017 8722 0.0 0.0 0.0
2018 8747 0.0 0.0 0.0
2019 8688 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-19 No Incident Encountered 0.00 0.00
2016-10-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References