X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445141508000

Well Details

Well ID: 0445141508000
Loading map...
Location: 00/08-15-044-14W5/0
Location Alias: 00/08-15-44-14 W5M
Location Alias 2: 00/08-15-044-14 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 14
Section: 15
County/Municipality: Clearwater County
Well Name: TOURMALINE BRAZR 8-15-44-14
Operator Name: Tourmaline Oil Corp.
License Number: 0497234
License Date: 2020-01-03
License Status: Issued
Spud Date: 2020-01-25
Final Drill Date: 2020-02-07
Well Total Depth: 4389.00 m
Surface Hole Latitude: 52.797999
Surface Hole Longitude: -115.958828

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-25 Ensign Drilling Inc. T038 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-26 144.30 Deviate (5 - 79 degrees)
2020-02-03 3055.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-13 Multi-Stage Fracture 4327.00 4327.10 0
2020-03-13 Multi-Stage Fracture 3867.70 3867.80 0
2020-03-13 Multi-Stage Fracture 3815.50 3815.60 0
2020-03-13 Multi-Stage Fracture 3762.90 3763.00 0
2020-03-13 Multi-Stage Fracture 3711.20 3711.30 0
2020-03-13 Multi-Stage Fracture 3659.30 3659.40 0
2020-03-13 Multi-Stage Fracture 3607.00 3607.10 0
2020-03-13 Multi-Stage Fracture 3554.90 3555.00 0
2020-03-13 Multi-Stage Fracture 3503.30 3503.40 0
2020-03-13 Multi-Stage Fracture 3451.30 3451.40 0
2020-03-13 Multi-Stage Fracture 3398.80 3398.90 0
2020-03-13 Multi-Stage Fracture 4285.40 4285.50 0
2020-03-13 Multi-Stage Fracture 3346.60 3346.70 0
2020-03-13 Multi-Stage Fracture 3294.80 3294.90 0
2020-03-13 Multi-Stage Fracture 3255.00 3255.10 0
2020-03-13 Multi-Stage Fracture 3215.70 3215.80 0
2020-03-13 Multi-Stage Fracture 4233.40 4233.50 0
2020-03-13 Multi-Stage Fracture 4181.10 4181.20 0
2020-03-13 Multi-Stage Fracture 4128.60 4128.70 0
2020-03-13 Multi-Stage Fracture 4076.40 4076.50 0
2020-03-13 Multi-Stage Fracture 4024.00 4024.10 0
2020-03-13 Multi-Stage Fracture 3971.70 3971.80 0
2020-03-13 Multi-Stage Fracture 3919.40 3919.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 336 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-07 No Incident Encountered 0.00 0.00
2020-03-22 No Incident Encountered 0.00 0.00

For data sources see[7]

References