X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445103502030

Well Details

Well ID: 0445103502030
Loading map...
Location: 03/02-35-044-10W5/0
Location Alias: 03/02-35-44-10 W5M
Location Alias 2: 03/02-35-044-10 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 10
Section: 35
County/Municipality: O'Chiese 203
Well Name: BELLATRIX UMNV FERRIER 2-35-44-10
Operator Name: Bellatrix Exploration Ltd.
License Number: 0492643
License Date: 2018-12-07
License Status: Issued
Spud Date: 2019-01-21
Final Drill Date: 2019-01-28
Well Total Depth: 4300.00 m
Surface Hole Latitude: 52.842202
Surface Hole Longitude: -115.352885

For data sources see[1][2]

Well History

Date Event
2018-12-07 Obtained License
2019-01-21 Lost Circulation Occurred
2019-01-22 Surface Casing Operation Performed
2019-01-24 Direction Drilling Operation Performed - Deviate
2019-01-25 Direction Drilling Operation Performed - Horizontal
2019-01-25 Well Log Performed
2019-01-28 Finished Drilling
2019-01-28 Well Log Performed
2019-01-28 Well Mode changed to Drilled and Cased
2019-01-29 Production Casing Operation Performed
2019-01-29 Well Log Performed
2019-01-30 Rig Released
2019-02-05 Perforation Treatment Performed - Open-Hole Completion
2019-02-05 Well Log Performed
2019-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-16 Well Began Production
2019-02-16 Well Fluid changed to Gas
2019-02-16 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-21 Akita Drilling Ltd. 34 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-24 792.20 Deviate (5 - 79 degrees)
2019-01-25 2479.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-02-05 Open Hole/Barefoot Completion 4295.00 4300.00 0
2019-02-15 Multi-Stage Fracture 3620.40 3620.50 0
2019-02-15 Multi-Stage Fracture 3537.20 3537.30 0
2019-02-15 Multi-Stage Fracture 3449.70 3449.80 0
2019-02-15 Multi-Stage Fracture 3378.60 3378.70 0
2019-02-15 Multi-Stage Fracture 3292.60 3292.70 0
2019-02-15 Multi-Stage Fracture 3218.80 3218.90 0
2019-02-15 Multi-Stage Fracture 3130.30 3130.40 0
2019-02-15 Multi-Stage Fracture 3056.80 3056.90 0
2019-02-15 Multi-Stage Fracture 2969.70 2969.80 0
2019-02-15 Multi-Stage Fracture 2895.80 2895.90 0
2019-02-15 Multi-Stage Fracture 4254.90 4255.00 0
2019-02-15 Multi-Stage Fracture 2823.40 2823.50 0
2019-02-15 Multi-Stage Fracture 2734.60 2734.70 0
2019-02-15 Multi-Stage Fracture 2660.40 2660.50 0
2019-02-15 Multi-Stage Fracture 2586.30 2586.40 0
2019-02-15 Multi-Stage Fracture 4175.50 4175.60 0
2019-02-15 Multi-Stage Fracture 4101.30 4101.40 0
2019-02-15 Multi-Stage Fracture 4013.20 4013.30 0
2019-02-15 Multi-Stage Fracture 3939.50 3939.60 0
2019-02-15 Multi-Stage Fracture 3852.60 3852.70 0
2019-02-15 Multi-Stage Fracture 3779.70 3779.80 0
2019-02-15 Multi-Stage Fracture 3693.30 3693.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-15 2019-02-15 2,345 4,395 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.1614 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.1597 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 13.3298 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0105 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0105 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0105 N/A
Polyethylene glycol 25322-68-3 100 0.0105 N/A
Sodium bromide 7647-15-6 100 0.0105 N/A
DWP-913. Clay Control Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.1761 N/A
DynaRate 6104. Friction Reducer Calfrac Friction Reducer Ammonium Chloride 12125-02-9 100 0.0893 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0893 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0893 N/A
Oleamide Trade Secret 100 0.0893 N/A
CalSurf 9400. Flowback Surfactant Calfrac Surfactant Ethoxylated Alcohols Trade Secret 100 0.0728 N/A
Methanol 67-56-1 100 0.0728 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0728 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-02-06 2019-02-15 Groundwater - Non-saline less than or equal to 150m deep 914
2019-02-06 2019-02-15 Surface Water - Runoff 492
2019-02-06 2019-02-15 Groundwater - Non-saline less than or equal to 150m deep 2637
2019-02-06 2019-02-15 Central Water Distribution Facility 132
2019-02-06 2019-02-15 Central Water Distribution Facility 220

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7125 0.0 0.0 0.0
2020 2138 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-21 Lost Circulation 32.00 630.00
2019-02-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References