X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445101104022

Well Details

Well ID: 0445101104022
Loading map...
Location: 02/04-11-044-10W5/2
Location Alias: 02/04-11-44-10 W5M
Location Alias 2: 02/04-11-044-10 W5/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 10
Section: 11
County/Municipality: O'Chiese 203
Well Name: NORTHROCK 102 FERRIER 4-11-44-10
Operator Name: TAQA North Ltd.
License Number: 0361637
License Date: 2006-08-14
License Status: Amended
Spud Date: 2006-11-17
Final Drill Date: 2006-12-27
Well Total Depth: 2950.00 m
Surface Hole Latitude: 52.766807
Surface Hole Longitude: -115.348042

For data sources see[1][2]

Well History

Date Event
2006-08-14 Obtained License
2006-11-21 Surface Casing Operation Performed
2006-11-22 Direction Drilling Operation Performed - Deviate
2006-12-20 Well Log Performed
2006-12-27 Finished Drilling
2006-12-27 Well Mode changed to Drilled and Cased
2006-12-29 Well Log Performed
2007-01-02 Production Casing Operation Performed
2007-01-03 Rig Released
2007-01-16 Perforation Treatment Performed - Jet Perforation
2007-01-16 Well Log Performed
2007-01-17 Perforation Treatment Performed - Fractured
2007-01-20 Well Log Performed
2007-01-21 Perforation Treatment Performed - Jet Perforation
2007-01-22 Perforation Treatment Performed - Fractured
2007-01-25 Well Log Performed
2007-01-26 Perforation Treatment Performed - Jet Perforation
2007-01-27 Perforation Treatment Performed - Fractured
2007-01-30 Perforation Treatment Performed - Jet Perforation
2007-01-30 Well Log Performed
2007-01-31 Perforation Treatment Performed - Fractured
2007-03-27 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-11-22 657.50 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-01-16 Perforation 2900.00 2902.00 17
2007-01-26 Perforation 2713.00 2715.00 17
2007-01-27 Fracture 2713.00 2730.00 0
2007-01-30 Perforation 2662.00 2665.00 17
2007-01-31 Fracture 2662.00 2665.00 0
2007-01-16 Perforation 2889.50 2895.00 17
2007-01-17 Fracture 2889.50 2902.00 0
2007-01-21 Perforation 2873.50 2878.00 17
2007-01-21 Perforation 2864.00 2869.00 17
2007-01-21 Perforation 2855.50 2859.00 17
2007-01-22 Fracture 2855.50 2878.00 0
2007-01-26 Perforation 2728.00 2730.00 17
2007-01-26 Perforation 2723.00 2725.00 17

For data sources see[5]



References