If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0445091505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.815229,"lon":-115.237727,"icon":""}]} |
Location: 00/05-15-044-09W5/0 | |
Location Alias: 00/05-15-44-09 W5M | |
Location Alias 2: 00/05-15-044-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 5 | |
Range: 09 | |
Section: 15 | |
County/Municipality: Clearwater County | |
Well Name: BELLATRIX CRDM WILLGR 5-15-44-9 | |
Operator Name: Bellatrix Exploration Ltd. | |
License Number: 0493410 | |
License Date: 2019-01-14 | |
License Status: Amended | |
Spud Date: 2019-02-03 | |
Final Drill Date: 2019-02-13 | |
Well Total Depth: 4814.00 m | |
Surface Hole Latitude: 52.815229 | |
Surface Hole Longitude: -115.237727 |
Date | Event |
---|---|
2019-01-14 | Obtained License |
2019-02-04 | Surface Casing Operation Performed |
2019-02-06 | Direction Drilling Operation Performed - Deviate |
2019-02-08 | Direction Drilling Operation Performed - Horizontal |
2019-02-08 | Well Log Performed |
2019-02-13 | Finished Drilling |
2019-02-13 | Well Log Performed |
2019-02-13 | Well Mode changed to Drilled and Cased |
2019-02-16 | Well Log Performed |
2019-02-17 | Production Casing Operation Performed |
2019-02-17 | Rig Released |
2019-02-20 | Perforation Treatment Performed - Open-Hole Completion |
2019-02-22 | Well Log Performed |
2019-03-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-04-17 | Well Began Production |
2019-04-17 | Well Fluid changed to Gas |
2019-04-17 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2019-02-06 | 870.00 | Deviate (5 - 79 degrees) |
2019-02-08 | 2173.60 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-02-20 | Open Hole/Barefoot Completion | 4805.00 | 4814.00 | 0 |
2019-03-05 | Multi-Stage Fracture | 4335.30 | 4335.40 | 0 |
2019-03-06 | Multi-Stage Fracture | 4278.10 | 4278.20 | 0 |
2019-03-06 | Multi-Stage Fracture | 4221.00 | 4221.10 | 0 |
2019-03-06 | Multi-Stage Fracture | 4164.40 | 4164.50 | 0 |
2019-03-06 | Multi-Stage Fracture | 4120.70 | 4120.80 | 0 |
2019-03-06 | Multi-Stage Fracture | 4063.50 | 4063.60 | 0 |
2019-03-06 | Multi-Stage Fracture | 4021.20 | 4021.30 | 0 |
2019-03-06 | Multi-Stage Fracture | 3963.20 | 3963.30 | 0 |
2019-03-06 | Multi-Stage Fracture | 3920.30 | 3920.40 | 0 |
2019-03-06 | Multi-Stage Fracture | 3862.40 | 3862.50 | 0 |
2019-03-05 | Multi-Stage Fracture | 4731.50 | 4731.60 | 0 |
2019-03-06 | Multi-Stage Fracture | 3819.00 | 3819.10 | 0 |
2019-03-06 | Multi-Stage Fracture | 3762.10 | 3762.20 | 0 |
2019-03-06 | Multi-Stage Fracture | 3703.90 | 3704.00 | 0 |
2019-03-07 | Multi-Stage Fracture | 3646.10 | 3646.20 | 0 |
2019-03-07 | Multi-Stage Fracture | 3603.00 | 3603.10 | 0 |
2019-03-07 | Multi-Stage Fracture | 3560.30 | 3560.40 | 0 |
2019-03-07 | Multi-Stage Fracture | 3516.40 | 3516.50 | 0 |
2019-03-07 | Multi-Stage Fracture | 3458.70 | 3458.80 | 0 |
2019-03-07 | Multi-Stage Fracture | 3415.50 | 3415.60 | 0 |
2019-03-07 | Multi-Stage Fracture | 3357.20 | 3357.30 | 0 |
2019-03-05 | Multi-Stage Fracture | 4674.00 | 4674.10 | 0 |
2019-03-07 | Multi-Stage Fracture | 3299.70 | 3299.80 | 0 |
2019-03-07 | Multi-Stage Fracture | 3256.50 | 3256.60 | 0 |
2019-03-07 | Multi-Stage Fracture | 3199.20 | 3199.30 | 0 |
2019-03-07 | Multi-Stage Fracture | 3155.90 | 3156.00 | 0 |
2019-03-07 | Multi-Stage Fracture | 3099.30 | 3099.40 | 0 |
2019-03-07 | Multi-Stage Fracture | 3055.60 | 3055.70 | 0 |
2019-03-07 | Multi-Stage Fracture | 2998.10 | 2998.20 | 0 |
2019-03-07 | Multi-Stage Fracture | 2954.80 | 2954.90 | 0 |
2019-03-07 | Multi-Stage Fracture | 2897.60 | 2897.70 | 0 |
2019-03-07 | Multi-Stage Fracture | 2855.10 | 2855.20 | 0 |
2019-03-05 | Multi-Stage Fracture | 4630.30 | 4630.40 | 0 |
2019-03-07 | Multi-Stage Fracture | 2797.40 | 2797.50 | 0 |
2019-03-07 | Multi-Stage Fracture | 2753.80 | 2753.90 | 0 |
2019-03-07 | Multi-Stage Fracture | 2696.40 | 2696.50 | 0 |
2019-03-07 | Multi-Stage Fracture | 2653.70 | 2653.80 | 0 |
2019-03-07 | Multi-Stage Fracture | 2596.10 | 2596.20 | 0 |
2019-03-07 | Multi-Stage Fracture | 2552.80 | 2552.90 | 0 |
2019-03-08 | Multi-Stage Fracture | 2495.50 | 2495.60 | 0 |
2019-03-08 | Multi-Stage Fracture | 2438.20 | 2438.30 | 0 |
2019-03-08 | Multi-Stage Fracture | 2381.00 | 2381.10 | 0 |
2019-03-08 | Multi-Stage Fracture | 2323.60 | 2323.70 | 0 |
2019-03-05 | Multi-Stage Fracture | 4573.60 | 4573.70 | 0 |
2019-03-08 | Multi-Stage Fracture | 2265.80 | 2265.90 | 0 |
2019-03-08 | Multi-Stage Fracture | 2207.40 | 2207.50 | 0 |
2019-03-08 | Multi-Stage Fracture | 2164.00 | 2164.10 | 0 |
2019-03-05 | Multi-Stage Fracture | 4533.40 | 4533.50 | 0 |
2019-03-05 | Multi-Stage Fracture | 4477.60 | 4477.70 | 0 |
2019-03-05 | Multi-Stage Fracture | 4435.00 | 4435.10 | 0 |
2019-03-05 | Multi-Stage Fracture | 4378.40 | 4378.50 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-03-05 | 2019-03-08 | 1,965 | 10,849 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 87.1868 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.2751 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 6.4023 | N/A | ||
50/140 Sand (Domestic) | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 0.4279 | N/A | ||
15% HCl Acid | Calfrac | Acid | Hydrochloric acid | 7647-01-0 | 100 | 0.4483 | N/A | |
Water | 7732-18-5 | 100 | 0.4483 | N/A | ||||
SaniFrac 8844. Biocide | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0117 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0117 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0117 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0117 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0117 | N/A | ||||
DWP-913. Clay Control | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1928 | N/A | |
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 1.3145 | N/A | |
DynaRate 6104. Friction Reducer | Calfrac | Friction Reducer | Ammonium Chloride | 12125-02-9 | 100 | 0.0933 | N/A | |
Hydrotreated Kerosene | 64742-47-8 | 100 | 0.0933 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0933 | N/A | ||||
Oleamide | Trade Secret | 100 | 0.0933 | N/A | ||||
CalSurf 9703. Advanced Nano Surfactant | Calfrac | Surfactant | 2-Propanol | 67-63-0 | 100 | 0.0822 | N/A | |
Alkylamine | 11757 | 100 | 0.0822 | N/A | ||||
Linear alkyl benzene sulfonic acid | 11757 | 100 | 0.0822 | N/A | ||||
Non-Hazardous Ingredients | 11757 | 100 | 0.0822 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 4996 | 0.0 | 0.0 | 0.0 |
2020 | 2164 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-02-18 | No Incident Encountered | 0.00 | 0.00 |
2019-03-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]