X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445090608000

Well Details

Well ID: 0445090608000
Loading map...
Location: 00/08-06-044-09W5/0
Location Alias: 00/08-06-44-09 W5M
Location Alias 2: 00/08-06-044-09 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 09
Section: 06
County/Municipality: O'Chiese 203
Well Name: BELLATRIX HZ WILLGR 8-6-44-9
Operator Name: Bellatrix Exploration Ltd.
License Number: 0444492
License Date: 2012-02-27
License Status: Issued
Spud Date: 2012-08-01
Final Drill Date: 2012-08-22
Well Total Depth: 3666.00 m
Surface Hole Latitude: 52.761139
Surface Hole Longitude: -115.309023

For data sources see[1][2]

Well History

Date Event
2012-02-27 Obtained License
2012-08-04 Surface Casing Operation Performed
2012-08-06 Lost Circulation Occurred
2012-08-13 Intermediate Casing Operation Performed
2012-08-15 Direction Drilling Operation Performed - Deviate
2012-08-17 Direction Drilling Operation Performed - Horizontal
2012-08-22 Finished Drilling
2012-08-22 Well Mode changed to Drilled and Cased
2012-08-24 Production Casing Operation Performed
2012-08-25 Rig Released
2012-08-28 Well Log Performed
2012-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-07 Well Began Production
2012-09-07 Well Fluid changed to Gas
2012-09-07 Well Mode changed to Flowing
2012-09-28 Well Log Performed
2014-09-01 Well Fluid changed to Gas
2014-09-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-01 Chinook Drilling Inc. 10 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-15 1889.00 Deviate (5 - 79 degrees)
2012-08-17 2246.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-05 Multi-Stage Fracture 3640.60 3640.70 0
2012-09-06 Multi-Stage Fracture 2896.60 2896.70 0
2012-09-06 Multi-Stage Fracture 2814.20 2814.30 0
2012-09-06 Multi-Stage Fracture 2731.60 2731.70 0
2012-09-06 Multi-Stage Fracture 2649.00 2649.10 0
2012-09-06 Multi-Stage Fracture 2566.00 2566.10 0
2012-09-06 Multi-Stage Fracture 2497.70 2497.80 0
2012-09-06 Multi-Stage Fracture 2402.00 2402.10 0
2012-09-06 Multi-Stage Fracture 2232.20 2332.30 0
2012-09-05 Multi-Stage Fracture 3565.60 3565.70 0
2012-09-05 Multi-Stage Fracture 3471.80 3471.90 0
2012-09-05 Multi-Stage Fracture 3389.70 3389.80 0
2012-09-05 Multi-Stage Fracture 3307.30 3307.40 0
2012-09-05 Multi-Stage Fracture 3237.30 3237.40 0
2012-09-05 Multi-Stage Fracture 3141.90 3142.00 0
2012-09-05 Multi-Stage Fracture 3060.10 3060.20 0
2012-09-06 Multi-Stage Fracture 2979.50 2979.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2771 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8686 0.0 0.0 0.0
2015 8679 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8548 0.0 0.0 0.0
2018 8490 0.0 0.0 0.0
2019 8325 0.0 0.0 0.0
2020 1938 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-06 Lost Circulation 1019.00 1847.00
2012-08-28 No Incident Encountered 0.00 0.00

For data sources see[8]

References