If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0445042013000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.799609,"lon":-114.552497,"icon":""}]} |
| Location: 00/13-20-044-04W5/0 | |
| Location Alias: 00/13-20-44-04 W5M | |
| Location Alias 2: 00/13-20-044-04 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 044 | |
| Meridian: 5 | |
| Range: 04 | |
| Section: 20 | |
| County/Municipality: Ponoka County | |
| Well Name: REGENT ET AL HZ MINHIK 13-20-44-4 | |
| Operator Name: Clearview Resources Ltd. | |
| License Number: 0446277 | |
| License Date: 2012-06-04 | |
| License Status: Issued | |
| Spud Date: 2012-07-10 | |
| Final Drill Date: 2012-07-17 | |
| Well Total Depth: 3115.00 m | |
| Surface Hole Latitude: 52.799609 | |
| Surface Hole Longitude: -114.552497 |
| Date | Event |
|---|---|
| 2012-06-04 | Obtained License |
| 2012-07-10 | Well Log Performed |
| 2012-07-11 | Surface Casing Operation Performed |
| 2012-07-13 | Direction Drilling Operation Performed - Deviate |
| 2012-07-14 | Direction Drilling Operation Performed - Horizontal |
| 2012-07-17 | Finished Drilling |
| 2012-07-17 | Well Mode changed to Drilled and Cased |
| 2012-07-20 | Production Casing Operation Performed |
| 2012-07-20 | Rig Released |
| 2012-08-09 | Well Log Performed |
| 2012-09-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-09-01 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-09-03 | Well Began Production |
| 2012-09-03 | Well Fluid changed to Crude Oil |
| 2012-09-03 | Well Mode changed to Flowing |
| 2013-01-01 | Well Fluid changed to Crude Oil |
| 2013-01-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-07-10 | Ensign Drilling Inc. | 115 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-07-13 | 1387.00 | Deviate (5 - 79 degrees) |
| 2012-07-14 | 1740.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-09-01 | Open Hole/Barefoot Completion | 3100.00 | 3115.00 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 2457.30 | 2457.40 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 2384.00 | 2384.10 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 2297.50 | 2297.60 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 2224.30 | 2224.40 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 2137.10 | 2137.20 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 2063.40 | 2063.50 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 1978.00 | 1978.10 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 1891.30 | 1891.40 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 1817.80 | 1817.90 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 3074.80 | 3074.90 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 2998.80 | 2998.90 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 2925.30 | 2925.40 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 2852.00 | 2852.10 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 2764.90 | 2765.00 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 2691.50 | 2691.60 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 2618.00 | 2618.10 | 0 |
| 2012-09-01 | Multi-Stage Fracture | 2530.70 | 2530.80 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 2309 | 0.0 | 0.0 | 0.0 |
| 2013 | 8323 | 0.0 | 0.0 | 0.0 |
| 2014 | 8022 | 0.0 | 0.0 | 0.0 |
| 2015 | 7086 | 0.0 | 0.0 | 0.0 |
| 2016 | 8396 | 0.0 | 0.0 | 0.0 |
| 2017 | 8426 | 0.0 | 0.0 | 0.0 |
| 2018 | 8687 | 0.0 | 0.0 | 0.0 |
| 2019 | 7200 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-07-20 | No Incident Encountered | 0.00 | 0.00 |
| 2012-09-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]