X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445021516000

Well Details

Well ID: 0445021516000
Loading map...
Location: 00/16-15-044-02W5/0
Location Alias: 00/16-15-44-02 W5M
Location Alias 2: 00/16-15-044-02 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 02
Section: 15
County/Municipality: Ponoka County
Well Name: BEC HZ PEMBINA 16-15-44-2
Operator Name: Bonavista Energy Corporation
License Number: 0478713
License Date: 2016-01-11
License Status: Issued
Spud Date: 2016-01-26
Final Drill Date: 2016-02-03
Well Total Depth: 3455.00 m
Surface Hole Latitude: 52.784669
Surface Hole Longitude: -114.199056

For data sources see[1][2]

Well History

Date Event
2016-01-11 Obtained License
2016-01-27 Surface Casing Operation Performed
2016-01-28 Direction Drilling Operation Performed - Deviate
2016-01-30 Direction Drilling Operation Performed - Horizontal
2016-01-31 Intermediate Casing Operation Performed
2016-02-03 Finished Drilling
2016-02-03 Well Log Performed
2016-02-03 Well Mode changed to Drilled and Cased
2016-02-04 Liner Casing Operation Performed
2016-02-05 Perforation Treatment Performed - Open-Hole Completion
2016-02-05 Rig Released
2016-02-07 Well Log Performed
2016-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2016-02-14 Well Fluid changed to Gas
2016-02-14 Well Mode changed to Testing
2016-02-22 Well Began Production
2016-02-22 Well Fluid changed to Gas
2016-02-22 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-01-26 Savanna Drilling Corp. 631 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-01-28 1126.10 Deviate (5 - 79 degrees)
2016-01-30 1993.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-02-05 Open Hole/Barefoot Completion 3433.00 3455.00 0
2016-02-12 Multi-Stage Fracture 2467.80 2467.90 0
2016-02-12 Multi-Stage Fracture 2357.40 2357.50 0
2016-02-12 Multi-Stage Fracture 2233.40 2233.50 0
2016-02-12 Multi-Stage Fracture 2109.30 2109.40 0
2016-02-12 Multi-Stage Fracture 3407.90 3408.00 0
2016-02-12 Multi-Stage Fracture 3318.10 3318.20 0
2016-02-12 Multi-Stage Fracture 3194.20 3194.30 0
2016-02-12 Multi-Stage Fracture 3070.20 3070.30 0
2016-02-12 Multi-Stage Fracture 2948.40 2948.50 0
2016-02-12 Multi-Stage Fracture 2839.90 2840.00 0
2016-02-12 Multi-Stage Fracture 2715.90 2716.00 0
2016-02-12 Multi-Stage Fracture 2591.90 2592.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-02-12 2016-02-12 1,859 684 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen 7727-37-9 100 19.3614 N/A
Water Not Available 100 42.0831 N/A
20/40 Sanjel Crystalline Silica 14808-60-7 100 37.5448 N/A
B-1008 Sanjel Bactericide/Biocide Broponol 52-51-7 100 0.0061 N/A
Methanol 67-56-1 100 0.0061 N/A
Non-Hazardous Ingredients Not Available 100 0.0061 N/A
OG-6BL Sanjel Breaker Magnesium Oxide 1309-48-4 100 0.0449 N/A
Non-Hazardous Ingredients Not Available 100 0.0449 N/A
BUFFER-A Sanjel Buffer Acetic Acid 64-19-7 100 0.0861 N/A
Non-Hazardous Ingredients Not Available 100 0.0861 N/A
CG-5 Sanjel Surfactant 2-Propanol 67-63-0 100 0.8734 N/A
Acetic Acid 64-19-7 100 0.8734 N/A
Amines. tallow alkyl. ethoxylated acetates (salts) 68551-33-7 100 0.8734 N/A
Non-Hazardous Ingredients Not Available 100 0.8734 N/A
Poly(oxy-1.2-ethaneldiyl).alpha.alpha'[(octadecylimino)di-2.1-ethanediyl]bis[omega-hydroxy-.hydrochloride
]
28883-73-0 100 0.8734 N/A
Sodium xylenesulfonate 1300-72-7 100 0.8734 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-02-09 2016-02-09 Surface Water - Runoff 700

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 7618 0.0 0.0 0.0
2017 8745 0.0 0.0 0.0
2018 8715 0.0 0.0 0.0
2019 8713 0.0 0.0 0.0
2020 2176 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-02-03 No Incident Encountered 0.00 0.00
2016-02-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References