X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445020605000

Well Details

Well ID: 0445020605000
Loading map...
Location: 00/05-06-044-02W5/0
Location Alias: 00/05-06-44-02 W5M
Location Alias 2: 00/05-06-044-02 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 02
Section: 06
County/Municipality: Ponoka County
Well Name: CVE PEMBINA 5-6-44-2
Operator Name: Cenovus Energy Inc.
License Number: 0424150
License Date: 2010-10-01
License Status: Issued
Spud Date: 2010-11-27
Final Drill Date: 2010-12-06
Well Total Depth: 3197.00 m
Surface Hole Latitude: 52.772994
Surface Hole Longitude: -114.284595

For data sources see[1][2]

Well History

Date Event
2010-10-01 Obtained License
2010-11-28 Surface Casing Operation Performed
2010-11-30 Direction Drilling Operation Performed - Horizontal
2010-12-02 Well Log Performed
2010-12-03 Intermediate Casing Operation Performed
2010-12-03 Well Log Performed
2010-12-06 Finished Drilling
2010-12-06 Well Log Performed
2010-12-06 Well Mode changed to Drilled and Cased
2010-12-08 Liner Casing Operation Performed
2010-12-08 Perforation Treatment Performed - Open-Hole Completion
2010-12-09 Rig Released
2010-12-29 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-30 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-31 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-31 Well Fluid changed to Gas
2010-12-31 Well Mode changed to Testing
2011-01-06 Well Fluid changed to Gas
2011-01-06 Well Mode changed to Test Completed
2011-01-18 Well Began Production
2011-01-18 Well Fluid changed to Gas
2011-01-18 Well Mode changed to Flowing
2014-04-01 Well Fluid changed to Gas
2014-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-30 1584.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-08 Open Hole/Barefoot Completion 3196.00 3197.00 0
2010-12-30 Multi-Stage Fracture 2197.00 2197.50 0
2010-12-31 Multi-Stage Fracture 2107.50 2108.00 0
2010-12-29 Multi-Stage Fracture 3183.60 3184.10 0
2010-12-29 Multi-Stage Fracture 2995.60 2996.10 0
2010-12-30 Multi-Stage Fracture 2850.30 2850.80 0
2010-12-30 Multi-Stage Fracture 2759.30 2759.80 0
2010-12-30 Multi-Stage Fracture 2654.40 2654.90 0
2010-12-30 Multi-Stage Fracture 2550.40 2550.90 0
2010-12-30 Multi-Stage Fracture 2432.40 2432.90 0
2010-12-30 Multi-Stage Fracture 2314.60 2315.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 75 0.0 0.0 0.0
2011 8199 0.0 0.0 0.0
2012 8537 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8448 0.0 0.0 0.0
2015 8375 0.0 0.0 0.0
2016 8712 0.0 0.0 0.0
2017 8712 0.0 0.0 0.0
2018 7468 0.0 0.0 0.0
2019 6731 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References