X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445013416020

Well Details

Well ID: 0445013416020
Loading map...
Location: 02/16-34-044-01W5/0
Location Alias: 02/16-34-44-01 W5M
Location Alias 2: 02/16-34-044-01 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 01
Section: 34
County/Municipality: Ponoka County
Well Name: CVE PEMBINA 16-34-44-1
Operator Name: Cenovus Energy Inc.
License Number: 0188001
License Date: 1996-05-24
License Status: Issued
Spud Date: 1996-06-05
Final Drill Date: 1996-06-17
Well Total Depth: 1947.00 m
Surface Hole Latitude: 52.840348
Surface Hole Longitude: -114.052824

For data sources see[1][2]

Well History

Date Event
1996-05-24 Obtained License
1996-06-07 Surface Casing Operation Performed
1996-06-11 Direction Drilling Operation Performed - Deviate
1996-06-17 Finished Drilling
1996-06-17 Well Mode changed to Drilled and Cased
1996-06-18 Well Log Performed
1996-06-20 Drill Stem Test Performed
1996-06-21 Drill Stem Test Performed
1996-06-23 Production Casing Operation Performed
1996-06-23 Rig Released
1996-07-06 Well Log Performed
1996-07-07 Perforation Treatment Performed - Jet Perforation
1996-07-09 Perforation Treatment Performed - Fractured
1996-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-12 Perforation Treatment Performed - Jet Perforation
1996-07-12 Plug Back Performed
1996-07-13 Perforation Treatment Performed - Fractured
1996-08-01 Well Began Production
1996-08-01 Well Fluid changed to Gas
1996-08-01 Well Mode changed to Flowing
2002-10-01 Well Fluid changed to Gas
2002-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-06-11 1265.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-07 Perforation 1850.00 1855.00 16
1996-07-09 Fracture 1850.00 1855.00 0
1996-07-12 Packing Device Capped w/Cement 1837.00 1845.00 0
1996-07-12 Perforation 1765.00 1772.00 17
1996-07-13 Fracture 1765.00 1772.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3642 0.0 0.0 0.0
1997 8493 0.0 0.0 0.0
1998 8000 0.0 0.0 0.0
1999 8183 0.0 0.0 0.0
2000 8501 0.0 0.0 0.0
2001 8440 0.0 0.0 0.0
2002 8553 0.0 0.0 0.0
2003 8049 0.0 0.0 0.0
2004 8512 0.0 0.0 0.0
2005 8550 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8183 0.0 0.0 0.0
2008 8424 0.0 0.0 0.0
2009 8592 0.0 0.0 0.0
2010 8583 0.0 0.0 0.0
2011 8383 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8629 0.0 0.0 0.0
2014 8338 0.0 0.0 0.0
2015 7938 0.0 0.0 0.0
2016 8031 0.0 0.0 0.0
2017 7298 0.0 0.0 0.0
2018 6206 0.0 0.0 0.0
2019 99 0.0 0.0 0.0

For data sources see[6]

References