X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445011012000

Well Details

Well ID: 0445011012000
Loading map...
Location: 00/12-10-044-01W5/0
Location Alias: 00/12-10-44-01 W5M
Location Alias 2: 00/12-10-044-01 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 01
Section: 10
County/Municipality: Ponoka County
Well Name: CANETIC RES WROSES 12-10-44-1
Operator Name: NAL Resources Limited
License Number: 0199016
License Date: 1997-03-06
License Status: Issued
Spud Date: 1997-03-06
Final Drill Date: 1997-03-19
Well Total Depth: 2274.40 m
Surface Hole Latitude: 52.779568
Surface Hole Longitude: -114.071328

For data sources see[1][2]

Well History

Date Event
1997-02-04 Well Log Performed
1997-03-06 Obtained License
1997-03-07 Surface Casing Operation Performed
1997-03-19 Finished Drilling
1997-03-19 Well Log Performed
1997-03-19 Well Mode changed to Drilled and Cased
1997-03-21 Production Casing Operation Performed
1997-03-21 Rig Released
1997-03-25 Perforation Treatment Performed - Open-Hole Completion
1997-03-27 Well Log Performed
1997-04-10 Perforation Treatment Performed - Cement Plug
1997-04-10 Perforation Treatment Performed - Open-Hole Completion
1997-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-03 Well Began Production
1997-05-03 Well Fluid changed to Crude Oil
1997-05-03 Well Mode changed to Pumping
1999-10-01 Well Fluid changed to Crude Oil
1999-10-01 Well Mode changed to Suspended
2002-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-19 Plug Back Performed
2002-07-19 Well Fluid changed to Crude Oil
2002-07-19 Well Log Performed
2002-07-19 Well Mode changed to Abandoned Zone
2002-07-20 Perforation Treatment Performed - Jet Perforation
2002-07-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-03-25 Open Hole/Barefoot Completion 2230.00 2274.40 0
1997-04-10 Cement Plug 2246.50 2274.40 0
1997-04-10 Open Hole/Barefoot Completion 2230.00 2246.50 0
1997-04-15 Acid Treatment 2230.00 2246.50 0
2002-07-19 Packing Device Capped w/Cement 2212.00 2220.00 0
2002-07-20 Perforation 1773.00 1778.00 17
2002-07-20 Perforation 1812.50 1815.00 17
2002-07-20 Perforation 1819.00 1822.00 17
2002-07-20 Perforation 1828.00 1832.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 5292 0.0 0.0 0.0
1998 1272 0.0 0.0 0.0

For data sources see[5]

References