X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444280107002

Well Details

Well ID: 0444280107002
Loading map...
Location: 00/07-01-044-28W4/2
Location Alias: 00/07-01-44-28 W4M
Location Alias 2: 00/07-01-044-28 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 28
Section: 01
County/Municipality: Ponoka County
Well Name: BONAVISTA FBANK 7-1-44-28
Operator Name: Bonavista Energy Corporation
License Number: 0165602
License Date: 1994-03-03
License Status: RecCertified
Spud Date: 1994-03-22
Final Drill Date: 1994-03-31
Well Total Depth: 1722.00 m
Surface Hole Latitude: 52.760794
Surface Hole Longitude: -113.934689

For data sources see[1][2]

Well History

Date Event
1994-03-03 Obtained License
1994-03-23 Surface Casing Operation Performed
1994-03-26 Direction Drilling Operation Performed - Deviate
1994-03-30 Lost Circulation Occurred
1994-03-31 Finished Drilling
1994-03-31 Well Log Performed
1994-04-01 Well Log Performed
1994-04-03 Production Casing Operation Performed
1994-04-03 Rig Released
1994-04-05 Well Log Performed
1994-04-17 Well Log Performed
1994-04-18 Well Log Performed
1994-04-19 Perforation Treatment Performed - Jet Perforation
1994-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-08 Well Log Performed
1995-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-25 Perforation Treatment Performed - Jet Perforation
1995-07-25 Well Log Performed
1995-07-26 Well Log Performed
1995-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-02 Plug Back Performed
1995-10-31 Perforation Treatment Performed - Jet Perforation
1995-10-31 Well Mode changed to Drilled and Cased
1995-11-01 Well Began Production
1995-11-01 Well Fluid changed to Gas
1995-11-01 Well Mode changed to Flowing
1996-12-08 Perforation Treatment Performed - Jet Perforation
1997-01-04 Perforation Treatment Performed - Jet Perforation
1997-01-04 Well Fluid changed to Gas
1997-01-04 Well Mode changed to Suspended
1997-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-19 Well Log Performed
1997-02-11 Well Fluid changed to Gas
1997-02-11 Well Mode changed to Suspended
1999-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-07-07 Plug Back Performed
1999-07-07 Well Log Performed
1999-07-08 Well Log Performed
1999-07-25 Perforation Treatment Performed - Jet Perforation
1999-07-26 Well Log Performed
1999-08-03 Perforation Treatment Performed - Jet Perforation
1999-08-04 Well Log Performed
2001-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-01 Plug Back Performed
2001-12-01 Well Fluid changed to Gas
2001-12-01 Well Mode changed to Abandoned Zone
2001-12-17 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-03-26 970.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-04-19 Perforation 1670.50 1675.50 20
1996-12-08 Perforation 1680.00 1685.00 18
1996-12-08 Perforation 1680.00 1683.00 20
1996-12-08 Perforation 1670.50 1675.50 20
1997-01-04 Perforation 1690.00 1693.00 18
1997-01-08 Acid Treatment 1692.50 1693.00 0
1997-01-11 Acid Treatment 1692.50 1693.00 0
1999-07-07 Packing Device Capped w/Cement 1652.00 1660.00 0
1999-07-25 Perforation 814.00 817.00 17
1999-08-03 Perforation 705.00 710.00 17
2001-12-01 Packing Device Capped w/Cement 885.00 893.00 0
1994-04-19 Perforation 1680.00 1683.00 20
2001-12-01 Packing Device Capped w/Cement 797.00 805.00 0
2001-12-01 Packing Device Capped w/Cement 687.00 695.00 0
1994-04-21 Acid Treatment 1670.50 1683.00 0
1995-01-12 Acid Treatment 1670.50 1683.00 0
1995-07-25 Perforation 1680.00 1685.00 18
1995-07-29 Acid Treatment 1679.50 1685.00 0
1995-07-30 Acid Treatment 1680.00 1685.00 0
1995-08-02 Packing Device Capped w/Cement 1659.50 1667.50 0
1995-10-31 Perforation 902.00 906.50 18

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1495 0.0 0.0 0.0
1996 7508 0.0 0.0 0.0
1997 73 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-03-30 Lost Circulation 1673.80 1722.00

For data sources see[7]

References