X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444270802000

Well Details

Well ID: 0444270802000
Loading map...
Location: 00/02-08-044-27W4/0
Location Alias: 00/02-08-44-27 W4M
Location Alias 2: 00/02-08-044-27 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 27
Section: 08
County/Municipality: Ponoka County
Well Name: CANETIC RES FBANK 2-8-44-27
Operator Name: NAL Resources Limited
License Number: 0009075
License Date: 1955-01-26
License Status: Suspension
Spud Date: 1955-03-26
Final Drill Date: 1955-07-21
Well Total Depth: 2386.60 m
Surface Hole Latitude: 52.772530
Surface Hole Longitude: -113.882632

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-01-26 Obtained License
1955-04-03 Drill Stem Test Performed
1955-04-04 Drill Stem Test Performed
1955-04-05 Drill Stem Test Performed
1955-04-06 Drill Stem Test Performed
1955-04-11 Drill Stem Test Performed
1955-04-12 Drill Stem Test Performed
1955-04-13 Drill Stem Test Performed
1955-04-20 Drill Stem Test Performed
1955-05-01 Drill Stem Test Performed
1955-05-18 Drill Stem Test Performed
1955-05-24 Drill Stem Test Performed
1955-05-26 Drill Stem Test Performed
1955-06-01 Drill Stem Test Performed
1955-06-12 Drill Stem Test Performed
1955-06-16 Drill Stem Test Performed
1955-06-20 Production Casing Operation Performed
1955-06-30 Drill Stem Test Performed
1955-07-04 Drill Stem Test Performed
1955-07-07 Drill Stem Test Performed
1955-07-21 Finished Drilling
1955-07-22 Perforation Treatment Performed - Bullet Perforation
1955-07-22 Perforation Treatment Performed - Jet Perforation
1955-07-24 Drill Stem Test Performed
1955-07-25 Drill Stem Test Performed
1955-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-07-30 Drill Stem Test Performed
1955-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-12 Perforation Treatment Performed - Fractured
1955-08-26 Perforation Treatment Performed - Cement Squeeze
1955-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-27 Perforation Treatment Performed - Bullet Perforation
1955-08-27 Perforation Treatment Performed - Jet Perforation
1955-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-30 Perforation Treatment Performed - Fractured
1955-09-01 Perforation Treatment Performed - Jet Perforation
1955-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-10-01 Perforation Treatment Performed - Cement Squeeze
1955-10-09 Drill Stem Test Performed
1955-10-09 Perforation Treatment Performed - Jet Perforation
1955-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-10-14 Drill Stem Test Performed
1955-10-17 Perforation Treatment Performed - Cement Squeeze
1955-10-18 Perforation Treatment Performed - Selective Jet Perforations
1955-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-10-21 Perforation Treatment Performed - Bullet Perforation
1955-10-21 Perforation Treatment Performed - Cement Squeeze
1955-10-21 Perforation Treatment Performed - Jet Perforation
1955-10-25 Drill Stem Test Performed
1955-10-25 Perforation Treatment Performed - Bullet Perforation
1955-10-25 Perforation Treatment Performed - Jet Perforation
1955-10-28 Drill Stem Test Performed
1955-10-28 Perforation Treatment Performed - Cement Squeeze
1955-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1955-11-03 Well Mode changed to Drilled and Cased
1995-06-20 Perforation Treatment Performed - Jet Perforation
1996-01-11 Well Began Production
1996-01-11 Well Fluid changed to Gas
1996-01-11 Well Mode changed to Flowing
1999-10-31 Well Fluid changed to Gas
1999-10-31 Well Mode changed to Suspended
2011-12-13 Well Log Performed
2011-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-07-22 Bullet Perforation 2180.20 2189.40 13
1955-08-27 Acid Treatment 2162.60 2171.70 0
1955-08-30 Acid Treatment 2162.60 2171.70 0
1955-08-30 Fracture 2162.60 2171.70 0
1955-09-01 Perforation 2162.60 2171.70 7
1955-09-02 Acid Treatment 2162.60 2171.70 0
1955-10-01 Cement Squeeze 2162.60 2171.70 0
1955-10-09 Perforation 1586.50 1592.60 13
1955-10-09 Perforation 1597.20 1600.20 13
1955-10-13 Acid Treatment 1586.50 1600.20 0
1955-10-17 Cement Squeeze 1586.50 1600.20 0
1955-07-22 Perforation 2180.20 2189.40 13
1955-10-18 Selective Jet Perforations 777.20 777.20 0
1955-10-21 Cement Squeeze 777.20 777.20 0
1955-10-21 Bullet Perforation 792.50 795.50 13
1955-10-21 Perforation 792.50 795.50 13
1955-10-21 Acid Treatment 792.50 795.50 0
1955-10-25 Bullet Perforation 797.40 801.90 13
1955-10-25 Perforation 797.40 801.90 13
1955-10-28 Cement Squeeze 797.40 801.90 0
1955-10-29 Packing Device Capped w/Cement 754.40 784.90 0
1995-06-20 Perforation 792.50 795.50 13
1955-07-29 Acid Treatment 2180.20 2189.40 0
2011-12-14 Packing Device Capped w/Cement 765.00 773.00 0
1955-08-05 Acid Treatment 2180.20 2189.40 0
1955-08-12 Acid Treatment 2180.20 2189.40 0
1955-08-12 Fracture 2180.20 2189.40 0
1955-08-26 Cement Squeeze 2180.20 2189.40 0
1955-08-27 Bullet Perforation 2162.60 2171.70 13
1955-08-27 Perforation 2162.60 2171.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 4630 0.0 0.0 0.0

For data sources see[5]

References