X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444260608000

Well Details

Well ID: 0444260608000
Loading map...
Location: 00/08-06-044-26W4/0
Location Alias: 00/08-06-44-26 W4M
Location Alias 2: 00/08-06-044-26 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 26
Section: 06
County/Municipality: Ponoka County
Well Name: OEI CHIGWELL 8-6-44-26
Operator Name: AlphaBow Energy Ltd.
License Number: 0121055
License Date: 1986-01-03
License Status: Issued
Spud Date: 1986-01-07
Final Drill Date: 1986-01-21
Well Total Depth: 1713.00 m
Surface Hole Latitude: 52.762902
Surface Hole Longitude: -113.758546

For data sources see[1][2]

Well History

Date Event
1986-01-03 Obtained License
1986-01-08 Surface Casing Operation Performed
1986-01-21 Finished Drilling
1986-01-21 Well Log Performed
1986-01-21 Well Mode changed to Drilled and Cased
1986-01-22 Drill Stem Test Performed
1986-01-23 Drill Stem Test Performed
1986-01-24 Production Casing Operation Performed
1986-01-24 Rig Released
1986-02-03 Perforation Treatment Performed - Jet Perforation
1986-02-03 Plug Back Performed
1986-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-02-07 Well Log Performed
1986-02-09 Perforation Treatment Performed - Jet Perforation
1986-02-10 Perforation Treatment Performed - Fractured
1986-02-15 Well Log Performed
1986-03-03 Well Began Production
1986-03-03 Well Fluid changed to Crude Oil
1986-03-03 Well Mode changed to Flowing
1988-08-31 Well Fluid changed to Crude Oil
1988-08-31 Well Mode changed to Pumping
2002-08-31 Well Fluid changed to Crude Oil
2002-08-31 Well Mode changed to Suspended
2006-06-07 Perforation Treatment Performed - Chemical Squeeze
2010-05-01 Well Fluid changed to Crude Oil
2010-05-01 Well Mode changed to Flowing
2011-12-03 Well Fluid changed to Crude Oil
2011-12-03 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-03 Perforation 1592.00 1594.00 7
1986-02-07 Packing Device Capped w/Cement 1579.00 1587.00 0
1986-02-09 Perforation 1421.80 1422.60 7
1986-02-09 Perforation 1424.00 1425.30 7
1986-02-10 Fracture 1421.80 1425.30 0
2006-06-07 Chemical Squeeze 1424.00 1425.30 0
2006-06-07 Chemical Squeeze 1421.80 1422.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 4277 0.0 0.0 0.0
1987 7522 0.0 0.0 0.0
1988 7103 0.0 0.0 0.0
1989 8651 0.0 0.0 0.0
1990 8025 0.0 0.0 0.0
1991 8725 0.0 0.0 0.0
1992 8751 0.0 0.0 0.0
1993 8693 0.0 0.0 0.0
1994 8259 0.0 0.0 0.0
1995 7322 0.0 0.0 0.0
1996 5487 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 5039 0.0 0.0 0.0
1999 6402 0.0 0.0 0.0
2000 840 0.0 0.0 0.0
2010 69 0.0 0.0 0.0
2011 121 0.0 0.0 0.0
2012 8493 0.0 0.0 0.0
2013 8448 0.0 0.0 0.0
2014 8591 0.0 0.0 0.0
2015 7565 0.0 0.0 0.0
2016 8514 0.0 0.0 0.0
2017 8286 0.0 0.0 0.0
2018 5742 0.0 0.0 0.0
2019 8029 0.0 0.0 0.0
2020 2136 0.0 0.0 0.0

For data sources see[5]

References