X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444251614003

Well Details

Well ID: 0444251614003
Loading map...
Location: 00/14-16-044-25W4/3
Location Alias: 00/14-16-44-25 W4M
Location Alias 2: 00/14-16-044-25 W4/03
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 25
Section: 16
County/Municipality: Ponoka County
Well Name: RALLYCANADA NELSON 14-16-44-25
Operator Name: Rally Canada Resources Ltd.
License Number: 0155759
License Date: 1993-01-18
License Status: Suspension
Spud Date: 1993-01-21
Final Drill Date: 1993-01-26
Well Total Depth: 1513.00 m
Surface Hole Latitude: 52.796173
Surface Hole Longitude: -113.576969

For data sources see[1][2]

Well History

Date Event
1993-01-18 Obtained License
1993-01-21 Surface Casing Operation Performed
1993-01-26 Finished Drilling
1993-01-26 Well Log Performed
1993-01-27 Drill Stem Test Performed
1993-01-28 Production Casing Operation Performed
1993-01-29 Rig Released
1993-02-05 Perforation Treatment Performed - Jet Perforation
1993-02-05 Well Log Performed
1993-03-14 Perforation Treatment Performed - Chemical Squeeze
1993-05-31 Perforation Treatment Performed - Chemical Squeeze
1995-01-03 Well Log Performed
1995-01-04 Perforation Treatment Performed - Jet Perforation
1995-01-04 Well Log Performed
1995-01-06 Perforation Treatment Performed - Fractured
1995-01-06 Well Log Performed
1995-02-01 Well Mode changed to Drilled and Cased
1998-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-12-16 Well Log Performed
1998-12-18 Perforation Treatment Performed - Jet Perforation
1998-12-18 Well Log Performed
2003-08-27 Perforation Treatment Performed - Jet Perforation
2003-12-13 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-02-05 Perforation 1479.00 1482.00 17
2003-08-27 Perforation 1468.00 1470.00 17
2003-08-27 Perforation 1472.00 1475.00 17
2003-12-13 Chemical Squeeze 1468.00 1470.00 0
2003-12-13 Chemical Squeeze 1472.00 1475.00 0
1993-03-14 Chemical Squeeze 1479.00 1482.00 0
1993-05-31 Chemical Squeeze 1479.00 1482.00 0
1995-01-04 Perforation 681.00 684.00 14
1995-01-04 Perforation 685.50 687.00 14
1995-01-04 Perforation 731.50 737.50 14
1995-01-06 Fracture 681.00 684.00 0
1998-12-16 Packing Device Capped w/Cement 1477.00 1478.00 0
1998-12-18 Perforation 1468.00 1470.00 13

For data sources see[4]



References