X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444223614000

Well Details

Well ID: 0444223614000
Loading map...
Location: 00/14-36-044-22W4/0
Location Alias: 00/14-36-44-22 W4M
Location Alias 2: 00/14-36-044-22 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 36
County/Municipality: County of Wetaskiwin No. 10
Well Name: CNRL NEW NORWAY 14-36-44-22
Operator Name: Canadian Natural Resources Limited
License Number: 0003570
License Date: 1951-10-03
License Status: Suspension
Spud Date: 1951-10-04
Final Drill Date: 1951-11-10
Well Total Depth: 1527.00 m
Surface Hole Latitude: 52.841476
Surface Hole Longitude: -113.065840

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-10-03 Obtained License
1951-10-13 Drill Stem Test Performed
1951-10-14 Drill Stem Test Performed
1951-10-19 Drill Stem Test Performed
1951-10-20 Drill Stem Test Performed
1951-10-22 Drill Stem Test Performed
1951-10-23 Drill Stem Test Performed
1951-10-26 Drill Stem Test Performed
1951-11-03 Drill Stem Test Performed
1951-11-05 Drill Stem Test Performed
1951-11-10 Drill Stem Test Performed
1951-11-10 Finished Drilling
1951-11-10 Well Mode changed to Drilled and Cased
1951-11-13 Production Casing Operation Performed
1951-11-15 Perforation Treatment Performed - Bullet Perforation
1951-11-16 Well Began Production
1951-11-16 Well Fluid changed to Crude Oil
1951-11-16 Well Mode changed to Flowing
1961-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-29 Perforation Treatment Performed - Jet Perforation
1962-12-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-31 Well Fluid changed to Crude Oil
1962-12-31 Well Mode changed to Flowing
1963-02-01 Perforation Treatment Performed - Cement Squeeze
1963-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-02-05 Perforation Treatment Performed - Jet Perforation
1963-03-08 Perforation Treatment Performed - Cement Squeeze
1963-03-08 Well Fluid changed to Crude Oil
1963-03-08 Well Mode changed to Flowing
1963-03-13 Perforation Treatment Performed - Jet Perforation
1963-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-12 Perforation Treatment Performed - Cement Squeeze
1973-12-14 Perforation Treatment Performed - Jet Perforation
1973-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-20 Well Fluid changed to Crude Oil
1973-12-20 Well Mode changed to Pumping
1980-02-01 Well Fluid changed to Crude Oil
1980-02-01 Well Mode changed to Suspended
1986-02-18 Well Log Performed
1986-02-20 Perforation Treatment Performed - Cement Squeeze
1986-02-21 Well Log Performed
1986-02-22 Perforation Treatment Performed - Jet Perforation
1986-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-19 Well Began Injection
1986-03-19 Well Fluid changed to Water
1986-03-19 Well Type changed to Disposal
1990-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-06-01 Well Fluid changed to Water
2006-06-01 Well Mode changed to Suspended
2006-06-01 Well Type changed to Disposal
2007-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-06-21 Plug Back Performed
2007-06-21 Well Fluid changed to Water
2007-06-21 Well Mode changed to Abandoned Zone
2007-06-21 Well Type changed to Disposal
2007-06-22 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-11-15 Bullet Perforation 1410.60 1424.30 13
1963-03-14 Acid Treatment 1415.50 1417.00 0
1973-12-12 Cement Squeeze 1410.60 1424.30 0
1973-12-14 Perforation 1413.70 1415.80 7
1973-12-15 Acid Treatment 1413.70 1415.80 0
1986-02-20 Cement Squeeze 1413.70 1415.80 0
1986-02-22 Perforation 1422.80 1428.80 13
1986-02-25 Acid Treatment 1422.80 1428.80 0
1990-02-06 Acid Treatment 1422.80 1428.80 0
1990-07-11 Acid Treatment 1422.80 1428.80 0
2007-06-21 Packing Device Capped w/Cement 1399.00 1407.00 0
1961-02-25 Acid Treatment 1414.00 1420.70 0
1962-12-29 Perforation 1394.50 1397.50 13
1962-12-30 Acid Treatment 1394.50 1397.50 0
1963-02-01 Cement Squeeze 1394.50 1397.50 0
1963-02-05 Perforation 1394.50 1397.50 13
1963-02-05 Acid Treatment 1394.50 1397.50 0
1963-03-08 Cement Squeeze 1394.50 1397.50 0
1963-03-13 Perforation 1415.50 1417.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3782 0.0 0.0 0.0
1968 3432 0.0 0.0 0.0
1969 3874 0.0 0.0 0.0
1970 3905 0.0 0.0 0.0
1971 5360 0.0 0.0 0.0
1972 7895 0.0 0.0 0.0
1973 7943 0.0 0.0 0.0
1974 7253 0.0 0.0 0.0
1975 8335 0.0 0.0 0.0
1976 8151 0.0 0.0 0.0
1977 8653 0.0 0.0 0.0
1978 8071 0.0 0.0 0.0
1979 7907 0.0 0.0 0.0
1980 574 0.0 0.0 0.0
1981 334 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0

For data sources see[5]

References