X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444112515002

Well Details

Well ID: 0444112515002
Loading map...
Location: 00/15-25-044-11W4/2
Location Alias: 00/15-25-44-11 W4M
Location Alias 2: 00/15-25-044-11 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 11
Section: 25
County/Municipality: Flagstaff County
Well Name: LONG RUN KILLAM 15-25-44-11
Operator Name: Long Run Exploration Ltd.
License Number: 0082772
License Date: 1980-05-13
License Status: Abandoned
Spud Date: 1980-05-22
Final Drill Date: 1980-05-26
Well Total Depth: 780.00 m
Surface Hole Latitude: 52.825548
Surface Hole Longitude: -111.462094

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-13 Obtained License
1980-05-25 Drill Stem Test Performed
1980-05-26 Drill Stem Test Performed
1980-05-26 Finished Drilling
1980-05-26 Well Mode changed to Drilled and Cased
1980-05-27 Production Casing Operation Performed
1980-06-08 Perforation Treatment Performed - Jet Perforation
1980-07-16 Perforation Treatment Performed - Fractured
1982-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-12-13 Perforation Treatment Performed - Jet Perforation
1982-12-21 Perforation Treatment Performed - Fractured
1982-12-22 Well Began Production
1982-12-22 Well Fluid changed to Gas
1982-12-22 Well Mode changed to Flowing
1994-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-07 Plug Back Performed
1994-11-07 Well Abandoned
1994-11-07 Well Fluid changed to Gas
1994-11-07 Well Mode changed to Abandoned
1994-11-08 Perforation Treatment Performed - Jet Perforation
1994-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-09 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-06-08 Perforation 661.50 665.00 4
1994-11-08 Perforation 295.00 296.00 13
1994-11-09 Acid Treatment 265.00 296.00 0
1994-11-09 Remedial Casing Cementing 265.00 296.00 0
1994-11-09 Packing Device Capped w/Cement 200.00 290.60 0
1980-07-16 Fracture 661.50 665.00 0
1982-12-13 Packing Device Capped w/Cement 647.00 655.00 0
1982-12-13 Perforation 610.00 611.50 7
1982-12-13 Perforation 615.30 615.80 7
1982-12-13 Perforation 619.50 620.50 7
1982-12-21 Fracture 610.00 620.50 0
1994-11-07 Packing Device Capped w/Cement 587.50 595.50 0
1994-11-08 Perforation 265.00 266.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 234 0.0 0.0 0.0
1983 4846 0.0 0.0 0.0
1984 2906 0.0 0.0 0.0
1985 7926 0.0 0.0 0.0
1986 6950 0.0 0.0 0.0
1987 2184 0.0 0.0 0.0
1988 2635 0.0 0.0 0.0
1989 5082 0.0 0.0 0.0
1990 4837 0.0 0.0 0.0
1991 4702 0.0 0.0 0.0
1992 6764 0.0 0.0 0.0

For data sources see[5]

References