X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444082812002

Well Details

Well ID: 0444082812002
Loading map...
Location: 00/12-28-044-08W4/2
Location Alias: 00/12-28-44-08 W4M
Location Alias 2: 00/12-28-044-08 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 08
Section: 28
County/Municipality: Municipal District of Wainwright No. 61
Well Name: CLEO ENERGY KILLAM 12-28-44-8
Operator Name: Cleo Energy Corp.
License Number: 0141373
License Date: 1989-10-18
License Status: Issued
Spud Date: 1989-10-23
Final Drill Date: 1989-10-25
Well Total Depth: 657.00 m
Surface Hole Latitude: 52.823545
Surface Hole Longitude: -111.111853

For data sources see[1][2]

Well History

Date Event
1989-10-18 Obtained License
1989-10-24 Surface Casing Operation Performed
1989-10-25 Finished Drilling
1989-10-26 Kick Occurred
1989-10-26 Well Log Performed
1989-10-27 Production Casing Operation Performed
1989-10-27 Rig Released
1990-01-11 Well Log Performed
1990-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-12 Perforation Treatment Performed - Jet Perforation
1990-01-12 Well Log Performed
1990-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-10 Perforation Treatment Performed - Remedial Casing
1990-02-14 Perforation Treatment Performed - Jet Perforation
1990-02-14 Well Log Performed
1990-02-15 Well Mode changed to Drilled and Cased
1990-03-05 Well Mode changed to Drilled and Cased
1993-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-20 Perforation Treatment Performed - Jet Perforation
1993-10-20 Plug Back Performed
1993-10-20 Well Log Performed
1993-12-20 Well Began Production
1993-12-20 Well Fluid changed to Gas
1993-12-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-01-12 Perforation 243.00 244.00 14
1993-10-20 Packing Device Capped w/Cement 630.00 638.00 0
1993-10-20 Perforation 543.00 545.00 13
1993-10-20 Perforation 534.50 540.50 13
1990-01-12 Acid Treatment 243.00 244.00 0
1990-01-18 Acid Treatment 243.00 244.00 0
1990-02-06 Acid Treatment 243.00 244.00 0
1990-02-08 Acid Treatment 243.00 244.00 0
1990-02-10 Acid Treatment 243.00 244.00 0
1990-02-10 Remedial Casing Cementing 243.00 244.00 0
1990-02-14 Perforation 578.50 580.50 14
1990-02-14 Perforation 650.00 651.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 281 0.0 0.0 0.0
1994 8128 0.0 0.0 0.0
1995 8158 0.0 0.0 0.0
1996 7732 0.0 0.0 0.0
1997 5895 0.0 0.0 0.0
1998 7363 0.0 0.0 0.0
1999 7011 0.0 0.0 0.0
2000 7981 0.0 0.0 0.0
2001 8014 0.0 0.0 0.0
2002 4543 0.0 0.0 0.0
2003 8752 0.0 0.0 0.0
2004 8779 0.0 0.0 0.0
2005 8564 0.0 0.0 0.0
2006 8737 0.0 0.0 0.0
2007 8746 0.0 0.0 0.0
2008 8773 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8750 0.0 0.0 0.0
2011 8728 0.0 0.0 0.0
2012 8730 0.0 0.0 0.0
2013 8723 0.0 0.0 0.0
2014 7741 0.0 0.0 0.0
2015 8695 0.0 0.0 0.0
2016 7480 0.0 0.0 0.0
2017 8643 0.0 0.0 0.0
2018 7400 0.0 0.0 0.0
2019 7541 0.0 0.0 0.0
2020 741 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-10-26 Kick 657.00 657.00

For data sources see[6]

References