X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444082606002

Well Details

Well ID: 0444082606002
Loading map...
Location: 00/06-26-044-08W4/2
Location Alias: 00/06-26-44-08 W4M
Location Alias 2: 00/06-26-044-08 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 08
Section: 26
County/Municipality: Municipal District of Wainwright No. 61
Well Name: CLEO ENERGY KILLAM 6-26-44-8
Operator Name: Cleo Energy Corp.
License Number: 0158121
License Date: 1993-05-06
License Status: Abandoned
Spud Date: 1993-05-18
Final Drill Date: 1993-05-20
Well Total Depth: 763.00 m
Surface Hole Latitude: 52.818309
Surface Hole Longitude: -111.058525

For data sources see[1][2]

Well History

Date Event
1993-05-06 Obtained License
1993-05-18 Lost Circulation Occurred
1993-05-18 Well Log Performed
1993-05-19 Surface Casing Operation Performed
1993-05-20 Finished Drilling
1993-05-20 Well Log Performed
1993-05-20 Well Mode changed to Drilled and Cased
1993-05-21 Production Casing Operation Performed
1993-05-21 Rig Released
1993-05-21 Well Log Performed
1993-06-09 Well Log Performed
1993-06-20 Perforation Treatment Performed - Jet Perforation
1993-06-20 Well Log Performed
1993-10-15 Well Began Production
1993-10-15 Well Fluid changed to Gas
1993-10-15 Well Mode changed to Flowing
1999-04-16 Well Fluid changed to Gas
1999-04-16 Well Mode changed to Suspended
1999-07-29 Well Fluid changed to Gas
1999-07-29 Well Mode changed to Flowing
2004-06-30 Well Fluid changed to Gas
2004-06-30 Well Mode changed to Suspended
2009-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-16 Plug Back Performed
2009-01-16 Well Fluid changed to Gas
2009-01-16 Well Log Performed
2009-01-16 Well Mode changed to Abandoned Zone
2009-01-17 Perforation Treatment Performed - Jet Perforation
2009-01-17 Well Log Performed
2009-02-01 Perforation Treatment Performed - Fractured
2015-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-06-17 Plug Back Performed
2017-06-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-06-20 Perforation 660.00 662.00 13
2015-06-17 Packing Device Capped w/Cement 472.00 480.00 0
1993-06-20 Perforation 619.50 622.00 13
1993-06-20 Perforation 617.00 618.50 13
1993-06-20 Perforation 613.50 616.00 13
1993-06-20 Perforation 611.00 612.00 13
2009-01-16 Packing Device Capped w/Cement 647.00 655.00 0
2009-01-16 Packing Device Capped w/Cement 597.00 605.00 0
2009-01-17 Perforation 486.00 489.00 17
2009-02-01 Fracture 486.00 489.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1864 0.0 0.0 0.0
1994 8399 0.0 0.0 0.0
1995 8611 0.0 0.0 0.0
1996 7415 0.0 0.0 0.0
1997 8186 0.0 0.0 0.0
1998 7883 0.0 0.0 0.0
1999 5939 0.0 0.0 0.0
2000 8624 0.0 0.0 0.0
2001 8758 0.0 0.0 0.0
2002 7760 0.0 0.0 0.0
2003 7243 0.0 0.0 0.0
2004 3407 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-05-18 Lost Circulation 76.00 76.00
2015-06-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References