X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444081107000

Well Details

Well ID: 0444081107000
Loading map...
Location: 00/07-11-044-08W4/0
Location Alias: 00/07-11-44-08 W4M
Location Alias 2: 00/07-11-044-08 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 08
Section: 11
County/Municipality: Municipal District of Wainwright No. 61
Well Name: CLEO ENERGY KILLAM 7-11-44-8
Operator Name: Cleo Energy Corp.
License Number: 0136642
License Date: 1988-09-26
License Status: Abandoned
Spud Date: 1988-09-29
Final Drill Date: 1988-10-03
Well Total Depth: 773.00 m
Surface Hole Latitude: 52.774758
Surface Hole Longitude: -111.050177

For data sources see[1][2]

Well History

Date Event
1988-09-26 Obtained License
1988-09-30 Surface Casing Operation Performed
1988-10-03 Finished Drilling
1988-10-03 Lost Circulation Occurred
1988-10-03 Well Log Performed
1988-10-04 Plug Back Performed
1988-10-04 Well Log Performed
1988-10-05 Plug Back Performed
1988-10-05 Production Casing Operation Performed
1988-10-06 Rig Released
1988-10-06 Well Mode changed to Drilled and Cased
1988-10-15 Well Log Performed
1988-10-16 Perforation Treatment Performed - Jet Perforation
1988-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-10-17 Plug Back Performed
1988-10-17 Well Log Performed
1988-10-18 Perforation Treatment Performed - Jet Perforation
1988-10-18 Well Log Performed
1988-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-20 Perforation Treatment Performed - Cement Squeeze
1988-10-20 Plug Back Performed
1988-10-20 Well Log Performed
1988-10-21 Perforation Treatment Performed - Jet Perforation
1988-10-21 Well Log Performed
1990-01-03 Well Began Production
1990-01-03 Well Fluid changed to Gas
1990-01-03 Well Mode changed to Flowing
2016-03-01 Well Fluid changed to Gas
2016-03-01 Well Mode changed to Suspended
2017-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-06-05 Plug Back Performed
2017-06-05 Well Fluid changed to Gas
2017-06-05 Well Mode changed to Abandoned Zone
2017-06-14 Well Abandoned
2017-06-14 Well Fluid changed to Gas
2017-06-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-10-16 Perforation 750.50 753.00 13
1988-10-17 Packing Device Capped w/Cement 737.00 745.00 0
1988-10-18 Perforation 647.00 650.00 13
1988-10-19 Acid Treatment 647.50 650.00 0
1988-10-20 Cement Squeeze 647.50 650.00 0
1988-10-21 Perforation 634.00 637.00 13
2017-06-05 Packing Device Capped w/Cement 619.00 627.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 7808 0.0 0.0 0.0
1991 8084 0.0 0.0 0.0
1992 7995 0.0 0.0 0.0
1993 7643 0.0 0.0 0.0
1994 6281 0.0 0.0 0.0
1995 8584 0.0 0.0 0.0
1996 7040 0.0 0.0 0.0
1997 7764 0.0 0.0 0.0
1998 6260 0.0 0.0 0.0
1999 7257 0.0 0.0 0.0
2000 8744 0.0 0.0 0.0
2001 8758 0.0 0.0 0.0
2002 8746 0.0 0.0 0.0
2003 8751 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8001 0.0 0.0 0.0
2006 8747 0.0 0.0 0.0
2007 8746 0.0 0.0 0.0
2008 8770 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 7375 0.0 0.0 0.0
2011 6270 0.0 0.0 0.0
2012 8728 0.0 0.0 0.0
2013 7954 0.0 0.0 0.0
2014 6560 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-10-03 Lost Circulation 773.00 773.00
2017-06-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References