If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444052415000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.812508,"lon":-110.593245,"icon":""}]} |
Location: 00/15-24-044-05W4/0 | |
Location Alias: 00/15-24-44-05 W4M | |
Location Alias 2: 00/15-24-044-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 4 | |
Range: 05 | |
Section: 24 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: TALISMAN ET AL WAINWR 15D-24-44-5 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0113585 | |
License Date: 1985-02-25 | |
License Status: Issued | |
Spud Date: 1985-03-15 | |
Final Drill Date: 1985-03-19 | |
Well Total Depth: 656.00 m | |
Surface Hole Latitude: 52.812508 | |
Surface Hole Longitude: -110.593245 |
Date | Event |
---|---|
1985-02-25 | Obtained License |
1985-03-16 | Surface Casing Operation Performed |
1985-03-19 | Finished Drilling |
1985-03-19 | Well Log Performed |
1985-03-19 | Well Mode changed to Drilled and Cased |
1985-03-20 | Drill Stem Test Performed |
1985-03-20 | Well Log Performed |
1985-03-21 | Production Casing Operation Performed |
1985-03-22 | Rig Released |
1985-03-25 | Well Log Performed |
1985-04-03 | Well Log Performed |
1985-04-04 | Well Log Performed |
1985-04-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-04-05 | Perforation Treatment Performed - Jet Perforation |
1985-04-06 | Well Log Performed |
1985-04-08 | Perforation Treatment Performed - Cement Squeeze |
1985-04-10 | Well Log Performed |
1985-04-11 | Perforation Treatment Performed - Jet Perforation |
1985-04-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-04-15 | Perforation Treatment Performed - Cement Squeeze |
1985-04-18 | Perforation Treatment Performed - Jet Perforation |
1985-04-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-04-19 | Well Log Performed |
1985-04-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-04-20 | Perforation Treatment Performed - Jet Perforation |
1985-04-21 | Well Began Production |
1985-04-21 | Well Fluid changed to Crude Oil |
1985-04-21 | Well Mode changed to Pumping |
1985-05-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-06-28 | Well Log Performed |
1989-10-31 | Well Fluid changed to Crude Oil |
1989-10-31 | Well Mode changed to Suspended |
1992-04-24 | Well Fluid changed to Crude Oil |
1992-04-24 | Well Mode changed to Pumping |
1996-10-01 | Well Fluid changed to Crude Oil |
1996-10-01 | Well Mode changed to Suspended |
2005-07-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-08 | Perforation Treatment Performed - Jet Perforation |
2005-07-08 | Plug Back Performed |
2005-07-08 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-04-05 | Perforation | 638.00 | 641.00 | 13 |
1985-04-18 | Perforation | 635.70 | 639.20 | 13 |
1985-04-18 | Perforation | 635.70 | 639.20 | 13 |
1985-04-19 | Acid Treatment | 635.70 | 639.20 | 0 |
1985-04-20 | Perforation | 639.20 | 640.80 | 13 |
1985-04-20 | Acid Treatment | 639.20 | 640.80 | 0 |
1985-05-12 | Acid Treatment | 635.70 | 640.80 | 0 |
2005-07-08 | Perforation | 580.00 | 583.50 | 20 |
2005-07-08 | Packing Device Capped w/Cement | 612.00 | 620.00 | 0 |
1985-04-05 | Perforation | 635.50 | 638.00 | 13 |
1985-04-05 | Perforation | 632.80 | 634.70 | 13 |
1985-04-05 | Acid Treatment | 632.80 | 641.00 | 0 |
1985-04-08 | Cement Squeeze | 632.80 | 641.00 | 0 |
1985-04-11 | Perforation | 633.00 | 634.30 | 13 |
1985-04-11 | Perforation | 635.70 | 637.00 | 13 |
1985-04-12 | Acid Treatment | 633.00 | 637.00 | 0 |
1985-04-15 | Cement Squeeze | 633.00 | 637.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 5888 | 0.0 | 0.0 | 0.0 |
1986 | 8731 | 0.0 | 0.0 | 0.0 |
1987 | 8759 | 0.0 | 0.0 | 0.0 |
1988 | 8700 | 0.0 | 0.0 | 0.0 |
1989 | 5826 | 0.0 | 0.0 | 0.0 |
1992 | 5997 | 0.0 | 0.0 | 0.0 |
1993 | 8331 | 0.0 | 0.0 | 0.0 |
For data sources see[5]