X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444052406003

Well Details

Well ID: 0444052406003
Loading map...
Location: 00/06-24-044-05W4/3
Location Alias: 00/06-24-44-05 W4M
Location Alias 2: 00/06-24-044-05 W4/03
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 05
Section: 24
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN ET AL WAINWR 6D-24-44-5
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0113584
License Date: 1985-02-25
License Status: Issued
Spud Date: 1985-03-08
Final Drill Date: 1985-03-12
Well Total Depth: 694.90 m
Surface Hole Latitude: 52.805987
Surface Hole Longitude: -110.597278

For data sources see[1][2]

Well History

Date Event
1985-02-25 Obtained License
1985-03-08 Surface Casing Operation Performed
1985-03-10 Drill Stem Test Performed
1985-03-12 Finished Drilling
1985-03-12 Well Log Performed
1985-03-13 Drill Stem Test Performed
1985-03-14 Production Casing Operation Performed
1985-03-14 Rig Released
1985-03-16 Well Log Performed
1985-03-20 Well Log Performed
1985-03-21 Perforation Treatment Performed - Open-Hole Completion
1985-03-22 Perforation Treatment Performed - Cement Plug
1985-03-22 Plug Back Performed
1985-03-23 Perforation Treatment Performed - Jet Perforation
1985-03-23 Well Log Performed
1985-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-28 Perforation Treatment Performed - Fractured
1985-03-31 Well Log Performed
1985-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-11-06 Plug Back Performed
1985-11-06 Well Log Performed
1985-11-07 Perforation Treatment Performed - Jet Perforation
1985-11-11 Perforation Treatment Performed - Jet Perforation
1985-11-16 Well Log Performed
1985-11-21 Well Mode changed to Drilled and Cased
1985-11-27 Well Log Performed
1986-03-01 Well Began Production
1986-03-01 Well Fluid changed to Gas
1986-03-01 Well Mode changed to Flowing
1996-11-04 Well Fluid changed to Gas
1996-11-04 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-21 Open Hole/Barefoot Completion 669.80 694.90 0
1985-11-11 Perforation 550.00 552.00 13
1985-03-22 Cement Plug 665.00 694.90 0
1985-03-23 Perforation 654.50 655.50 13
1985-03-23 Perforation 658.00 659.00 13
1985-03-23 Perforation 659.60 660.20 13
1985-03-25 Acid Treatment 654.50 660.20 0
1985-03-28 Fracture 654.50 660.20 0
1985-11-06 Packing Device Capped w/Cement 637.00 640.00 0
1985-11-07 Perforation 593.00 595.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 5200 0.0 0.0 0.0
1987 4235 0.0 0.0 0.0
1988 7970 0.0 0.0 0.0
1989 7736 0.0 0.0 0.0
1990 5611 0.0 0.0 0.0
1991 4064 0.0 0.0 0.0
1992 1725 0.0 0.0 0.0
1993 8282 0.0 0.0 0.0
1994 7785 0.0 0.0 0.0
1995 8663 0.0 0.0 0.0
1996 7266 0.0 0.0 0.0

For data sources see[5]

References