X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444052111000

Well Details

Well ID: 0444052111000
Loading map...
Location: 00/11-21-044-05W4/0
Location Alias: 00/11-21-44-05 W4M
Location Alias 2: 00/11-21-044-05 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 05
Section: 21
County/Municipality: Municipal District of Wainwright No. 61
Well Name: SURGE ENERGY WAINWR 11-21-44-5
Operator Name: Surge Energy Inc.
License Number: 0033893
License Date: 1968-03-18
License Status: Abandoned
Spud Date: 1968-04-01
Final Drill Date: 1968-04-04
Well Total Depth: 682.80 m
Surface Hole Latitude: 52.808915
Surface Hole Longitude: -110.672307

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-03-18 Obtained License
1968-04-04 Finished Drilling
1968-04-05 Drill Stem Test Performed
1968-04-06 Drill Stem Test Performed
1968-04-07 Drill Stem Test Performed
1968-04-07 Production Casing Operation Performed
1969-03-28 Well Mode changed to Drilled and Cased
1969-04-11 Perforation Treatment Performed - Fractured
1969-04-11 Perforation Treatment Performed - Jet Perforation
1994-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-09 Plug Back Performed
1994-08-09 Well Log Performed
1994-08-09 Well Mode changed to Abandoned Zone
1994-08-10 Well Log Performed
1994-08-11 Perforation Treatment Performed - Jet Perforation
1994-08-11 Well Log Performed
1994-08-12 Perforation Treatment Performed - Cement Squeeze
1994-08-12 Perforation Treatment Performed - Jet Perforation
1994-08-13 Perforation Treatment Performed - Jet Perforation
2001-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-11 Perforation Treatment Performed - Jet Perforation
2001-02-11 Plug Back Performed
2001-02-11 Well Log Performed
2001-06-01 Perforation Treatment Performed - Jet Perforation
2001-06-01 Well Log Performed
2001-06-02 Perforation Treatment Performed - Remedial Casing
2001-06-04 Well Log Performed
2001-06-06 Perforation Treatment Performed - Jet Perforation
2001-06-06 Well Log Performed
2001-06-07 Perforation Treatment Performed - Remedial Casing
2001-06-09 Well Log Performed
2001-06-11 Perforation Treatment Performed - Jet Perforation
2001-06-11 Well Log Performed
2001-06-12 Perforation Treatment Performed - Remedial Casing
2001-06-13 Well Log Performed
2001-06-14 Well Log Performed
2001-06-15 Perforation Treatment Performed - Abrasa-Jet Perforation
2001-06-15 Perforation Treatment Performed - Remedial Casing
2001-07-06 Well Log Performed
2001-08-19 Perforation Treatment Performed - Remedial Casing
2001-08-19 Well Log Performed
2001-08-21 Well Log Performed
2001-08-23 Well Log Performed
2001-08-24 Perforation Treatment Performed - Abrasa-Jet Perforation
2001-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-25 Perforation Treatment Performed - Remedial Casing
2001-08-28 Well Log Performed
2001-08-30 Well Log Performed
2001-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-31 Perforation Treatment Performed - Jet Perforation
2001-08-31 Perforation Treatment Performed - Remedial Casing
2001-09-04 Well Log Performed
2001-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-06 Perforation Treatment Performed - Cement Squeeze
2001-09-06 Plug Back Performed
2001-09-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-04-11 Perforation 585.80 590.10 7
2001-02-11 Packing Device Capped w/Cement 533.00 542.00 0
2001-02-11 Packing Device Capped w/Cement 514.00 522.00 0
2001-02-11 Perforation 188.00 189.00 13
2001-06-01 Perforation 505.00 506.00 20
2001-06-01 Perforation 434.00 435.00 20
2001-06-02 Remedial Casing Cementing 505.00 506.00 0
2001-06-06 Perforation 544.00 547.00 20
2001-06-07 Remedial Casing Cementing 544.00 547.00 0
2001-06-11 Perforation 533.50 535.50 20
2001-06-12 Remedial Casing Cementing 533.50 535.50 0
1969-04-11 Fracture 585.80 590.10 0
2001-06-15 Hydra Jet Perforation 544.00 544.50 2
2001-06-15 Remedial Casing Cementing 544.00 544.50 0
2001-08-19 Remedial Casing Cementing 434.00 435.00 0
2001-08-24 Packing Device Capped w/Cement 533.50 541.50 0
2001-08-24 Packing Device Capped w/Cement 422.00 430.00 0
2001-08-24 Hydra Jet Perforation 365.00 365.50 1
2001-08-25 Remedial Casing Cementing 365.00 365.50 0
2001-08-25 Packing Device Capped w/Cement 341.70 362.00 0
2001-08-31 Perforation 226.00 227.00 20
2001-08-31 Remedial Casing Cementing 226.00 227.00 0
1994-08-09 Packing Device Capped w/Cement 567.30 575.30 0
2001-08-31 Packing Device Capped w/Cement 214.50 223.00 0
2001-09-06 Cement Squeeze 188.00 189.00 0
2001-09-06 Packing Device Capped w/Cement 169.60 184.50 0
1994-08-11 Perforation 535.00 536.50 20
1994-08-12 Cement Squeeze 535.00 536.50 0
1994-08-12 Perforation 525.00 526.00 13
1994-08-12 Cement Squeeze 525.00 526.00 0
1994-08-13 Perforation 544.10 546.80 13
1994-08-13 Perforation 548.90 550.80 13

For data sources see[4]



References