X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444043413002

Well Details

Well ID: 0444043413002
Loading map...
Location: 00/13-34-044-04W4/2
Location Alias: 00/13-34-44-04 W4M
Location Alias 2: 00/13-34-044-04 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 04
Section: 34
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN 13B EDGERTON 13-34-44-4
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0205898
License Date: 1997-09-09
License Status: Issued
Spud Date: 1997-09-26
Final Drill Date: 1997-09-29
Well Total Depth: 778.80 m
Surface Hole Latitude: 52.840623
Surface Hole Longitude: -110.511190

For data sources see[1][2]

Well History

Date Event
1997-09-09 Obtained License
1997-09-26 Well Log Performed
1997-09-27 Direction Drilling Operation Performed - Deviate
1997-09-27 Surface Casing Operation Performed
1997-09-29 Finished Drilling
1997-09-29 Well Log Performed
1997-09-29 Well Mode changed to Drilled and Cased
1997-09-30 Production Casing Operation Performed
1997-09-30 Rig Released
1997-10-11 Well Log Performed
1997-10-18 Liner Casing Operation Performed
1997-11-06 Perforation Treatment Performed - Jet Perforation
2005-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-26 Plug Back Performed
2005-05-27 Perforation Treatment Performed - Jet Perforation
2005-05-27 Well Log Performed
2005-09-28 Perforation Treatment Performed - Fractured
2006-04-01 Well Began Production
2006-04-01 Well Fluid changed to Gas
2006-04-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-09-27 210.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-11-06 Perforation 718.00 720.00 13
2005-05-26 Packing Device Capped w/Cement 700.00 710.00 0
2005-05-27 Perforation 591.00 594.00 20
2005-09-28 Fracture 591.00 594.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 6466 0.0 0.0 0.0
2007 6312 0.0 0.0 0.0
2008 6854 0.0 0.0 0.0
2009 7646 0.0 0.0 0.0
2010 8192 0.0 0.0 0.0
2011 8490 0.0 0.0 0.0
2012 8413 0.0 0.0 0.0
2013 8120 0.0 0.0 0.0
2014 8166 0.0 0.0 0.0
2015 8536 0.0 0.0 0.0
2016 2897 0.0 0.0 0.0
2017 1875 0.0 0.0 0.0
2018 7416 0.0 0.0 0.0
2019 6846 0.0 0.0 0.0
2020 1115 0.0 0.0 0.0

For data sources see[6]

References