X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444042811003

Well Details

Well ID: 0444042811003
Loading map...
Location: 00/11-28-044-04W4/3
Location Alias: 00/11-28-44-04 W4M
Location Alias 2: 00/11-28-044-04 W4/03
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 04
Section: 28
County/Municipality: Municipal District of Wainwright No. 61
Well Name: BVI EDGERTON 11-28-44-4
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0113882
License Date: 1985-03-11
License Status: Abandoned
Spud Date: 1985-04-16
Final Drill Date: 1985-04-20
Well Total Depth: 690.00 m
Surface Hole Latitude: 52.825092
Surface Hole Longitude: -110.527226

For data sources see[1][2]

Well History

Date Event
1985-03-11 Obtained License
1985-04-17 Surface Casing Operation Performed
1985-04-20 Finished Drilling
1985-04-20 Well Log Performed
1985-04-20 Well Mode changed to Drilled and Cased
1985-04-21 Drill Stem Test Performed
1985-04-22 Production Casing Operation Performed
1985-04-22 Rig Released
1985-05-11 Perforation Treatment Performed - Jet Perforation
1985-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-13 Perforation Treatment Performed - Jet Perforation
1985-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-06 Perforation Treatment Performed - Fractured
2001-08-20 Perforation Treatment Performed - Cement Squeeze
2001-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-26 Perforation Treatment Performed - Jet Perforation
2001-08-26 Well Log Performed
2001-08-27 Perforation Treatment Performed - Jet Perforation
2001-08-27 Well Log Performed
2004-10-13 Perforation Treatment Performed - Cement Plug
2004-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-16 Perforation Treatment Performed - Cement Plug
2004-10-16 Perforation Treatment Performed - Jet Perforation
2004-10-24 Perforation Treatment Performed - Cement Plug
2004-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-10 Perforation Treatment Performed - Cement Plug
2004-11-10 Plug Back Performed
2008-09-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-05-11 Perforation 665.30 666.30 13
2001-08-27 Perforation 590.00 591.00 17
2001-08-27 Perforation 593.00 594.50 17
2004-10-13 Cement Plug 588.00 596.00 0
2004-10-14 Packing Device Capped w/Cement 571.80 579.80 0
2004-10-16 Perforation 367.00 368.00 17
2004-10-16 Cement Plug 360.00 400.00 0
2004-10-24 Cement Plug 248.50 264.30 0
2004-11-05 Packing Device Capped w/Cement 238.00 246.00 0
2004-11-10 Cement Plug 109.90 196.00 0
1985-05-12 Acid Treatment 665.30 666.30 0
1985-05-13 Perforation 661.00 664.00 13
1985-05-13 Perforation 650.00 654.00 13
1985-05-15 Acid Treatment 650.00 664.00 0
1985-12-06 Fracture 650.00 666.30 0
2001-08-20 Cement Squeeze 650.00 666.30 0
2001-08-26 Packing Device Capped w/Cement 618.00 625.00 0
2001-08-26 Perforation 597.00 598.00 17

For data sources see[4]



References