If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0435113410003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.750654,"lon":-115.509561,"icon":""}]} |
| Location: 00/10-34-043-11W5/3 | |
| Location Alias: 00/10-34-43-11 W5M | |
| Location Alias 2: 00/10-34-043-11 W5/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 043 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 34 | |
| County/Municipality: Clearwater County | |
| Well Name: CVE FERRIER 10-34-43-11 | |
| Operator Name: Cenovus Energy Inc. | |
| License Number: 0037161 | |
| License Date: 1969-11-05 | |
| License Status: Abandoned | |
| Spud Date: 1969-11-08 | |
| Final Drill Date: 1969-12-27 | |
| Well Total Depth: 3058.70 m | |
| Surface Hole Latitude: 52.750654 | |
| Surface Hole Longitude: -115.509561 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1969-11-05 | Obtained License |
| 1969-12-27 | Finished Drilling |
| 1969-12-27 | Well Mode changed to Drilled and Cased |
| 1969-12-31 | Drill Stem Test Performed |
| 1970-01-01 | Production Casing Operation Performed |
| 1970-02-02 | Perforation Treatment Performed - Jet Perforation |
| 1970-02-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-02-05 | Perforation Treatment Performed - Cement Squeeze |
| 1970-02-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-02-06 | Perforation Treatment Performed - Jet Perforation |
| 1970-02-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-02-07 | Perforation Treatment Performed - Jet Perforation |
| 1970-02-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-02-08 | Perforation Treatment Performed - Jet Perforation |
| 1970-02-09 | Perforation Treatment Performed - Jet Perforation |
| 1970-02-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-02-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-02-13 | Perforation Treatment Performed - Jet Perforation |
| 1970-02-14 | Perforation Treatment Performed - Jet Perforation |
| 1970-02-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-02-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-02-19 | Perforation Treatment Performed - Jet Perforation |
| 1970-02-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-02-23 | Perforation Treatment Performed - Cement Squeeze |
| 1970-02-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-02-24 | Perforation Treatment Performed - Jet Perforation |
| 1970-02-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-02-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-02-28 | Perforation Treatment Performed - Cement Squeeze |
| 1970-03-01 | Perforation Treatment Performed - Jet Perforation |
| 1970-03-03 | Perforation Treatment Performed - Cement Squeeze |
| 1970-03-04 | Perforation Treatment Performed - Cement Squeeze |
| 1970-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-03-06 | Perforation Treatment Performed - Jet Perforation |
| 1970-03-07 | Perforation Treatment Performed - Cement Squeeze |
| 1970-03-08 | Perforation Treatment Performed - Jet Perforation |
| 1970-03-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-03-10 | Perforation Treatment Performed - Cement Squeeze |
| 1970-03-11 | Perforation Treatment Performed - Cement Squeeze |
| 1970-03-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-03-13 | Perforation Treatment Performed - Jet Perforation |
| 1970-03-14 | Perforation Treatment Performed - Cement Squeeze |
| 1970-03-20 | Perforation Treatment Performed - Cement Squeeze |
| 1970-03-20 | Perforation Treatment Performed - Jet Perforation |
| 1970-03-22 | Perforation Treatment Performed - Jet Perforation |
| 1970-03-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-03-23 | Perforation Treatment Performed - Jet Perforation |
| 1975-11-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1993-06-26 | Well Log Performed |
| 1993-06-27 | Perforation Treatment Performed - Jet Perforation |
| 1993-06-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-09-08 | Well Log Performed |
| 1996-09-09 | Perforation Treatment Performed - Cement Squeeze |
| 1996-09-09 | Perforation Treatment Performed - Jet Perforation |
| 1996-09-09 | Well Log Performed |
| 1996-09-10 | Perforation Treatment Performed - Jet Perforation |
| 1996-09-14 | Well Log Performed |
| 1996-09-15 | Well Log Performed |
| 1998-09-30 | Well Log Performed |
| 1998-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-10-17 | Plug Back Performed |
| 1998-10-17 | Well Log Performed |
| 2000-03-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2001-12-05 | Well Log Performed |
| 2001-12-06 | Well Log Performed |
| 2001-12-07 | Perforation Treatment Performed - Cement Squeeze |
| 2001-12-07 | Well Log Performed |
| 2001-12-13 | Well Log Performed |
| 2004-05-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-05-26 | Plug Back Performed |
| 2004-05-26 | Well Log Performed |
| 2004-05-29 | Perforation Treatment Performed - Jet Perforation |
| 2004-05-29 | Perforation Treatment Performed - Remedial Casing |
| 2004-05-31 | Perforation Treatment Performed - Jet Perforation |
| 2004-06-01 | Perforation Treatment Performed - Jet Perforation |
| 2004-06-03 | Perforation Treatment Performed - Fractured |
| 2004-06-03 | Well Began Production |
| 2004-06-03 | Well Fluid changed to Gas |
| 2004-06-03 | Well Mode changed to Flowing |
| 2004-07-01 | Well Fluid changed to Gas |
| 2004-07-01 | Well Mode changed to Pumping |
| 2015-02-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2015-02-02 | Plug Back Performed |
| 2015-02-02 | Well Fluid changed to Gas |
| 2015-02-02 | Well Mode changed to Abandoned Zone |
| 2016-08-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-08-19 | Perforation Treatment Performed - Jet Perforation |
| 2016-08-19 | Plug Back Performed |
| 2016-08-19 | Well Log Performed |
| 2016-08-20 | Perforation Treatment Performed - Remedial Casing |
| 2016-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-08-21 | Perforation Treatment Performed - Jet Perforation |
| 2016-08-21 | Well Log Performed |
| 2016-08-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-08-30 | Perforation Treatment Performed - Remedial Casing |
| 2016-09-15 | Well Abandoned |
| 2016-09-15 | Well Fluid changed to Gas |
| 2016-09-15 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1970-02-02 | Perforation | 2998.60 | 2999.80 | 7 |
| 1970-02-08 | Acid Treatment | 2952.60 | 2977.30 | 0 |
| 1970-02-09 | Perforation | 2921.80 | 2923.60 | 7 |
| 1970-02-11 | Acid Treatment | 2921.80 | 2977.30 | 0 |
| 1970-02-13 | Perforation | 2931.60 | 2933.40 | 7 |
| 1970-02-13 | Acid Treatment | 2931.60 | 2977.30 | 0 |
| 1970-02-14 | Perforation | 2947.40 | 2950.50 | 7 |
| 1970-02-15 | Acid Treatment | 2921.80 | 2977.30 | 0 |
| 1970-02-19 | Perforation | 2837.70 | 2838.90 | 7 |
| 1970-02-19 | Acid Treatment | 2837.70 | 2838.90 | 0 |
| 1970-02-22 | Acid Treatment | 2837.70 | 2838.90 | 0 |
| 1970-02-02 | Perforation | 3007.80 | 3010.80 | 3 |
| 1970-02-23 | Cement Squeeze | 2837.70 | 2838.90 | 0 |
| 1970-02-24 | Perforation | 2806.00 | 2807.20 | 7 |
| 1970-02-24 | Acid Treatment | 2806.00 | 2807.20 | 0 |
| 1970-02-25 | Acid Treatment | 2806.00 | 2807.20 | 0 |
| 1970-02-26 | Acid Treatment | 2806.00 | 2807.20 | 0 |
| 1970-02-28 | Cement Squeeze | 2806.00 | 2807.20 | 0 |
| 1970-03-01 | Perforation | 2745.30 | 2747.20 | 7 |
| 1970-03-03 | Cement Squeeze | 2745.30 | 2747.20 | 0 |
| 1970-03-04 | Cement Squeeze | 2745.30 | 2747.20 | 0 |
| 1970-03-06 | Perforation | 2724.60 | 2725.80 | 7 |
| 1970-02-03 | Acid Treatment | 2998.60 | 3010.80 | 0 |
| 1970-03-06 | Acid Treatment | 2724.60 | 2725.80 | 0 |
| 1970-03-07 | Cement Squeeze | 2724.60 | 2725.80 | 0 |
| 1970-03-08 | Perforation | 2586.20 | 2586.80 | 7 |
| 1970-03-08 | Perforation | 2587.80 | 2588.40 | 7 |
| 1970-03-08 | Perforation | 2589.90 | 2590.50 | 7 |
| 1970-03-09 | Acid Treatment | 2586.20 | 2590.50 | 0 |
| 1970-03-10 | Cement Squeeze | 2586.20 | 2590.50 | 0 |
| 1970-03-11 | Cement Squeeze | 2586.20 | 2590.50 | 0 |
| 1970-03-13 | Perforation | 2564.60 | 2566.10 | 3 |
| 1970-03-13 | Perforation | 2568.20 | 2569.50 | 7 |
| 1970-02-05 | Cement Squeeze | 2998.60 | 3010.80 | 0 |
| 1970-03-13 | Perforation | 2576.80 | 2578.00 | 7 |
| 1970-03-13 | Acid Treatment | 2564.60 | 2578.00 | 0 |
| 1970-03-14 | Cement Squeeze | 2564.60 | 2578.00 | 0 |
| 1970-03-20 | Perforation | 2946.20 | 2947.70 | 7 |
| 1970-03-20 | Cement Squeeze | 2921.80 | 2933.40 | 0 |
| 1970-03-22 | Perforation | 2931.60 | 2933.40 | 7 |
| 1970-03-22 | Perforation | 2921.80 | 2923.60 | 7 |
| 1970-03-23 | Perforation | 2897.40 | 2900.50 | 7 |
| 1970-03-23 | Perforation | 2902.90 | 2907.80 | 7 |
| 1970-03-23 | Acid Treatment | 2897.40 | 2933.40 | 0 |
| 1970-02-06 | Perforation | 2957.80 | 2960.80 | 7 |
| 1975-11-14 | Packing Device Capped w/Cement | 2929.10 | 2931.30 | 0 |
| 1993-06-27 | Perforation | 2921.10 | 2924.10 | 13 |
| 1993-06-27 | Perforation | 2902.70 | 2907.70 | 13 |
| 1993-06-27 | Perforation | 2897.30 | 2900.30 | 13 |
| 1993-06-28 | Acid Treatment | 2897.30 | 2924.10 | 0 |
| 1996-09-09 | Perforation | 1470.00 | 1471.00 | 13 |
| 1996-09-09 | Cement Squeeze | 1470.00 | 1471.00 | 0 |
| 1996-09-10 | Perforation | 630.00 | 631.00 | 13 |
| 1998-10-17 | Packing Device Capped w/Cement | 2914.80 | 2918.00 | 0 |
| 2000-03-17 | Acid Treatment | 2897.40 | 2907.00 | 0 |
| 1970-02-06 | Acid Treatment | 2957.80 | 2960.80 | 0 |
| 2001-12-07 | Cement Squeeze | 2902.70 | 2907.70 | 0 |
| 2004-05-26 | Packing Device Capped w/Cement | 2875.00 | 2883.00 | 0 |
| 2004-05-29 | Perforation | 1470.00 | 1471.00 | 7 |
| 2004-05-29 | Remedial Casing Cementing | 1470.00 | 1471.00 | 0 |
| 2004-05-31 | Perforation | 2855.50 | 2857.30 | 17 |
| 2004-05-31 | Perforation | 2842.60 | 2844.40 | 17 |
| 2004-06-01 | Perforation | 2837.10 | 2840.10 | 17 |
| 2004-06-03 | Fracture | 2837.10 | 2857.30 | 0 |
| 2015-02-02 | Packing Device Capped w/Cement | 2550.00 | 2823.00 | 0 |
| 2016-08-19 | Packing Device Capped w/Cement | 1455.00 | 1463.00 | 0 |
| 1970-02-07 | Perforation | 2952.60 | 2953.50 | 7 |
| 2016-08-19 | Perforation | 877.00 | 879.00 | 18 |
| 2016-08-20 | Remedial Casing Cementing | 877.00 | 879.00 | 0 |
| 2016-08-21 | Packing Device Capped w/Cement | 862.00 | 870.00 | 0 |
| 2016-08-21 | Packing Device Capped w/Cement | 615.00 | 623.00 | 0 |
| 2016-08-21 | Perforation | 493.00 | 494.00 | 18 |
| 2016-08-30 | Remedial Casing Cementing | 493.00 | 494.00 | 0 |
| 2016-08-30 | Packing Device Capped w/Cement | 475.00 | 483.00 | 0 |
| 1970-02-07 | Acid Treatment | 2952.60 | 2953.50 | 0 |
| 1970-02-08 | Perforation | 2976.10 | 2977.30 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 4154 | 0.0 | 0.0 | 0.0 |
| 2005 | 8434 | 0.0 | 0.0 | 0.0 |
| 2006 | 8759 | 0.0 | 0.0 | 0.0 |
| 2007 | 8135 | 0.0 | 0.0 | 0.0 |
| 2008 | 8207 | 0.0 | 0.0 | 0.0 |
| 2009 | 8640 | 0.0 | 0.0 | 0.0 |
| 2010 | 7206 | 0.0 | 0.0 | 0.0 |
| 2011 | 8556 | 0.0 | 0.0 | 0.0 |
| 2012 | 8692 | 0.0 | 0.0 | 0.0 |
| 2013 | 3239 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-03-03 | No Incident Encountered | 0.00 | 0.00 |
| 2016-08-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]