X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435092516000

Well Details

Well ID: 0435092516000
Loading map...
Location: 00/16-25-043-09W5/0
Location Alias: 00/16-25-43-09 W5M
Location Alias 2: 00/16-25-043-09 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 09
Section: 25
County/Municipality: Clearwater County
Well Name: PENN WEST HZ WILLGR 16-25-43-9
Operator Name: Obsidian Energy Ltd.
License Number: 0424897
License Date: 2010-10-21
License Status: Issued
Spud Date: 2011-03-26
Final Drill Date: 2011-07-07
Well Total Depth: 3138.00 m
Surface Hole Latitude: 52.728261
Surface Hole Longitude: -115.166327

For data sources see[1][2]

Well History

Date Event
2010-10-21 Obtained License
2011-03-29 Surface Casing Operation Performed
2011-06-19 Well Log Performed
2011-06-21 Direction Drilling Operation Performed - Horizontal
2011-06-29 Intermediate Casing Operation Performed
2011-06-30 Well Log Performed
2011-07-07 Finished Drilling
2011-07-07 Well Mode changed to Drilled and Cased
2011-07-16 Liner Casing Operation Performed
2011-07-16 Rig Released
2011-09-22 Well Log Performed
2011-10-01 Well Log Performed
2011-10-08 Well Log Performed
2011-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-26 Perforation Treatment Performed - Open-Hole Completion
2011-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-20 Well Began Production
2011-12-20 Well Fluid changed to Crude Oil
2011-12-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-06-21 1710.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-26 Open Hole/Barefoot Completion 3125.00 3138.00 0
2011-10-28 Multi-Stage Fracture 2501.50 2501.60 0
2011-10-29 Multi-Stage Fracture 2460.20 2460.30 0
2011-10-31 Multi-Stage Fracture 2407.10 2407.20 0
2011-10-31 Multi-Stage Fracture 2352.90 2353.00 0
2011-10-31 Multi-Stage Fracture 2311.20 2311.30 0
2011-10-31 Multi-Stage Fracture 2256.50 2256.60 0
2011-10-26 Multi-Stage Fracture 2905.00 2905.10 0
2011-10-26 Multi-Stage Fracture 2852.40 2852.50 0
2011-10-26 Multi-Stage Fracture 2797.70 2797.80 0
2011-10-26 Multi-Stage Fracture 2756.00 2756.10 0
2011-10-28 Multi-Stage Fracture 2703.20 2703.30 0
2011-10-28 Multi-Stage Fracture 2649.40 2649.50 0
2011-10-28 Multi-Stage Fracture 2608.90 2609.00 0
2011-10-28 Multi-Stage Fracture 2556.20 2556.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 48 0.0 0.0 0.0
2012 7875 0.0 0.0 0.0
2013 8320 0.0 0.0 0.0
2014 8530 0.0 0.0 0.0
2015 8453 0.0 0.0 0.0
2016 6104 0.0 0.0 0.0
2017 8468 0.0 0.0 0.0
2018 8027 0.0 0.0 0.0
2019 7887 0.0 0.0 0.0
2020 1977 0.0 0.0 0.0

For data sources see[6]

References