X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435092002000

Well Details

Well ID: 0435092002000
Loading map...
Location: 00/02-20-043-09W5/0
Location Alias: 00/02-20-43-09 W5M
Location Alias 2: 00/02-20-043-09 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 09
Section: 20
County/Municipality: Clearwater County
Well Name: YANGARRA HZ WILLGR 2-20-43-9
Operator Name: Yangarra Resources Corp.
License Number: 0473410
License Date: 2014-12-17
License Status: Amended
Spud Date: 2015-06-07
Final Drill Date: 2015-06-18
Well Total Depth: 3719.00 m
Surface Hole Latitude: 52.729668
Surface Hole Longitude: -115.264389

For data sources see[1][2]

Well History

Date Event
2014-12-17 Obtained License
2015-06-08 Surface Casing Operation Performed
2015-06-11 Well Log Performed
2015-06-12 Direction Drilling Operation Performed - Deviate
2015-06-14 Direction Drilling Operation Performed - Horizontal
2015-06-18 Finished Drilling
2015-06-18 Well Log Performed
2015-06-18 Well Mode changed to Drilled and Cased
2015-06-20 Production Casing Operation Performed
2015-06-20 Rig Released
2015-12-02 Well Log Performed
2015-12-06 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-07 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-15 Well Log Performed
2016-01-25 Well Began Production
2016-01-25 Well Fluid changed to Crude Oil
2016-01-25 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-06-07 Trinidad Drilling Ltd. 53 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-06-12 1704.70 Deviate (5 - 79 degrees)
2015-06-14 2283.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-12-06 Multi-Stage Fracture 3687.70 3689.60 0
2015-12-07 Multi-Stage Fracture 3311.00 3312.90 0
2015-12-07 Multi-Stage Fracture 3267.30 3269.20 0
2015-12-07 Multi-Stage Fracture 3223.60 3225.50 0
2015-12-07 Multi-Stage Fracture 3180.30 3182.20 0
2015-12-07 Multi-Stage Fracture 3137.30 3139.20 0
2015-12-07 Multi-Stage Fracture 3093.90 3095.80 0
2015-12-07 Multi-Stage Fracture 3050.40 3052.30 0
2015-12-07 Multi-Stage Fracture 3007.00 3008.90 0
2015-12-07 Multi-Stage Fracture 2963.50 2965.40 0
2015-12-08 Multi-Stage Fracture 2920.10 2922.00 0
2015-12-06 Multi-Stage Fracture 3657.50 3659.40 0
2015-12-08 Multi-Stage Fracture 2877.00 2878.90 0
2015-12-08 Multi-Stage Fracture 2833.60 2835.50 0
2015-12-08 Multi-Stage Fracture 2790.00 2791.90 0
2015-12-08 Multi-Stage Fracture 2746.30 2748.20 0
2015-12-08 Multi-Stage Fracture 2702.40 2704.30 0
2015-12-08 Multi-Stage Fracture 2658.60 2660.50 0
2015-12-08 Multi-Stage Fracture 2601.70 2603.60 0
2015-12-08 Multi-Stage Fracture 2545.00 2546.90 0
2015-12-08 Multi-Stage Fracture 2488.30 2490.20 0
2015-12-08 Multi-Stage Fracture 2432.20 2434.10 0
2015-12-06 Multi-Stage Fracture 3614.10 3616.00 0
2015-12-08 Multi-Stage Fracture 2375.60 2377.50 0
2015-12-08 Multi-Stage Fracture 2331.70 2333.60 0
2015-12-06 Multi-Stage Fracture 3570.60 3572.50 0
2015-12-07 Multi-Stage Fracture 3528.00 3529.90 0
2015-12-07 Multi-Stage Fracture 3484.50 3486.40 0
2015-12-07 Multi-Stage Fracture 3440.90 3442.80 0
2015-12-07 Multi-Stage Fracture 3397.80 3399.70 0
2015-12-07 Multi-Stage Fracture 3354.50 3356.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-12-06 2015-12-08 2,108 3,124 N/A
2 2015-12-07 2015-12-08 2,108 0 N/A
3 2015-12-06 2015-12-06 2,108 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 88.6057 N/A
20/40 Step Energy Services Crystalline Silica 14808-60-7 100 7.6244 N/A
30/50 Step Energy Services Crystalline Silica 14808-60-7 100 4.3609 N/A
40/70 Step Energy Services Crystalline Silica 14808-60-7 100 0.6105 N/A
Econocide B1008 Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.012 N/A
Methyl Alcohol 67-56-1 100 0.012 N/A
Non-Hazardous Ingredients Not Available 100 0.012 N/A
SCS-1 Step Energy Services Clay Control Choline chloride 67-48-1 100 0.1443 N/A
Non-Hazardous Ingredients Not Available 100 0.1443 N/A
SNE-2 Step Energy Services Demulsifier Glycerine 56-81-5 100 0.0583 N/A
Non-Hazardous Ingredients Not Available 100 0.0583 N/A
Propylene Glycol 57-55-6 100 0.0583 N/A
SFR-101 Step Energy Services Friction Reducer Ammonium Chloride 12125-02-9 100 0.0907 N/A
Distillates (petroleum) hydrotreated light 64742-47-8 100 0.0907 N/A
Non-Hazardous Ingredients Not Available 100 0.0907 N/A
SWG-101L Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.0804 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0804 N/A
2 SBO-3 Step Energy Services Breaker Persulfate compounds 7727-54-0 100 0.0043 N/A
3 SML-1 Step Energy Services Friction Reducer Non-Hazardous Ingredients Not Available 100 0.0507 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-11-25 2015-12-05 Surface Water - Lake 3300

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 7624 0.0 0.0 0.0
2017 8550 0.0 0.0 0.0
2018 6965 0.0 0.0 0.0
2019 8390 0.0 0.0 0.0
2020 2134 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-20 No Incident Encountered 0.00 0.00
2015-12-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References