If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435091904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.722044,"lon":-115.281671,"icon":""}]} |
Location: 00/04-19-043-09W5/0 | |
Location Alias: 00/04-19-43-09 W5M | |
Location Alias 2: 00/04-19-043-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 09 | |
Section: 19 | |
County/Municipality: Clearwater County | |
Well Name: BELLATRIX UMNV WILLGR 4-19-43-9 | |
Operator Name: Bellatrix Exploration Ltd. | |
License Number: 0482586 | |
License Date: 2017-01-25 | |
License Status: Amended | |
Spud Date: 2017-06-23 | |
Final Drill Date: 2017-07-03 | |
Well Total Depth: 4090.00 m | |
Surface Hole Latitude: 52.722044 | |
Surface Hole Longitude: -115.281671 |
Date | Event |
---|---|
2017-01-25 | Obtained License |
2017-06-24 | Surface Casing Operation Performed |
2017-06-24 | Well Log Performed |
2017-06-25 | Direction Drilling Operation Performed - Deviate |
2017-06-28 | Intermediate Casing Operation Performed |
2017-06-30 | Direction Drilling Operation Performed - Horizontal |
2017-07-01 | Well Log Performed |
2017-07-03 | Finished Drilling |
2017-07-03 | Well Mode changed to Drilled and Cased |
2017-07-04 | Well Log Performed |
2017-07-06 | Production Casing Operation Performed |
2017-07-07 | Rig Released |
2017-07-07 | Well Fluid changed to Gas |
2017-07-07 | Well Mode changed to Testing |
2017-07-09 | Well Log Performed |
2017-07-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-23 | Perforation Treatment Performed - Open-Hole Completion |
2017-07-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-25 | Well Began Production |
2017-07-25 | Well Fluid changed to Gas |
2017-07-25 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-06-23 | Chinook Drilling Inc. | 9 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-06-25 | 728.40 | Deviate (5 - 79 degrees) |
2017-06-30 | 2730.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-07-23 | Open Hole/Barefoot Completion | 4085.00 | 4090.00 | 0 |
2017-07-23 | Multi-Stage Fracture | 3465.90 | 3466.00 | 0 |
2017-07-24 | Multi-Stage Fracture | 3378.10 | 3378.20 | 0 |
2017-07-24 | Multi-Stage Fracture | 3304.50 | 3304.60 | 0 |
2017-07-24 | Multi-Stage Fracture | 3231.30 | 3231.40 | 0 |
2017-07-24 | Multi-Stage Fracture | 3157.80 | 3157.90 | 0 |
2017-07-24 | Multi-Stage Fracture | 3069.90 | 3070.00 | 0 |
2017-07-24 | Multi-Stage Fracture | 2996.40 | 2996.50 | 0 |
2017-07-24 | Multi-Stage Fracture | 2923.10 | 2923.20 | 0 |
2017-07-24 | Multi-Stage Fracture | 2849.80 | 2849.90 | 0 |
2017-07-23 | Multi-Stage Fracture | 4059.20 | 4059.30 | 0 |
2017-07-23 | Multi-Stage Fracture | 3995.00 | 3995.10 | 0 |
2017-07-23 | Multi-Stage Fracture | 3921.50 | 3921.60 | 0 |
2017-07-23 | Multi-Stage Fracture | 3847.90 | 3848.00 | 0 |
2017-07-23 | Multi-Stage Fracture | 3774.50 | 3774.60 | 0 |
2017-07-23 | Multi-Stage Fracture | 3686.80 | 3686.90 | 0 |
2017-07-23 | Multi-Stage Fracture | 3613.20 | 3613.30 | 0 |
2017-07-23 | Multi-Stage Fracture | 3539.60 | 3539.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-07-23 | 2017-07-24 | 2,566 | 3,002 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 80.8187 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.9289 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 15.134 | N/A | ||
DWP-944 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0161 | N/A | |
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0161 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.2857 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.1321 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.1321 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.1321 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1321 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.1321 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.1321 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.1321 | N/A | ||||
DWP-641 | Calfrac | Friction Reducer | Ammonium chloride | 12125-02-9 | 100 | 0.1339 | N/A | |
Distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.1339 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1339 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-07-15 | 2017-07-18 | Groundwater - Non-saline less than or equal to 150m deep | 1680 |
2017-07-10 | 2017-07-12 | Surface Water - Runoff | 1605 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 4087 | 0.0 | 0.0 | 0.0 |
2018 | 7475 | 0.0 | 0.0 | 0.0 |
2019 | 8481 | 0.0 | 0.0 | 0.0 |
2020 | 2017 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-07-07 | No Incident Encountered | 0.00 | 0.00 |
2017-07-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]