X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435081505000

Well Details

Well ID: 0435081505000
Loading map...
Location: 00/05-15-043-08W5/0
Location Alias: 00/05-15-43-08 W5M
Location Alias 2: 00/05-15-043-08 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 08
Section: 15
County/Municipality: Clearwater County
Well Name: OBE HZ 102 WILLGR 5-15-43-8
Operator Name: Obsidian Energy Ltd.
License Number: 0496059
License Date: 2019-10-10
License Status: Amended
Spud Date: 2019-12-29
Final Drill Date: 2020-01-13
Well Total Depth: 4827.00 m
Surface Hole Latitude: 52.729405
Surface Hole Longitude: -115.069569

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2020-01-01 1527.60 Deviate (5 - 79 degrees)
2020-01-04 2044.80 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-12 Multi-Stage Fracture 4789.40 4790.10 0
2020-02-13 Multi-Stage Fracture 4049.30 4049.90 0
2020-02-13 Multi-Stage Fracture 3962.50 3963.10 0
2020-02-13 Multi-Stage Fracture 3874.80 3875.40 0
2020-02-13 Multi-Stage Fracture 3789.70 3790.40 0
2020-02-13 Multi-Stage Fracture 3708.30 3708.90 0
2020-02-13 Multi-Stage Fracture 3622.00 3622.60 0
2020-02-13 Multi-Stage Fracture 3536.90 3538.10 0
2020-02-13 Multi-Stage Fracture 3274.70 3275.90 0
2020-02-13 Multi-Stage Fracture 3188.20 3189.40 0
2020-02-13 Multi-Stage Fracture 3100.00 3101.20 0
2020-02-12 Multi-Stage Fracture 4744.60 4745.20 0
2020-02-13 Multi-Stage Fracture 3011.50 3012.70 0
2020-02-13 Multi-Stage Fracture 2924.20 2925.40 0
2020-02-13 Multi-Stage Fracture 2837.00 2838.30 0
2020-02-13 Multi-Stage Fracture 2750.50 2751.70 0
2020-02-13 Multi-Stage Fracture 2662.70 2663.90 0
2020-02-13 Multi-Stage Fracture 2576.70 2577.90 0
2020-02-13 Multi-Stage Fracture 2489.60 2490.80 0
2020-02-13 Multi-Stage Fracture 2403.20 2404.40 0
2020-02-13 Multi-Stage Fracture 2316.80 2318.00 0
2020-02-13 Multi-Stage Fracture 2232.50 2233.70 0
2020-02-12 Multi-Stage Fracture 4658.30 4658.90 0
2020-02-13 Multi-Stage Fracture 2146.00 2147.20 0
2020-02-12 Multi-Stage Fracture 4572.30 4572.90 0
2020-02-12 Multi-Stage Fracture 4483.90 4484.50 0
2020-02-12 Multi-Stage Fracture 4396.00 4396.70 0
2020-02-12 Multi-Stage Fracture 4307.60 4308.30 0
2020-02-12 Multi-Stage Fracture 4220.50 4221.20 0
2020-02-13 Multi-Stage Fracture 4134.80 4135.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 48 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-15 No Incident Encountered 0.00 0.00
2020-02-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References