X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435042004000

Well Details

Well ID: 0435042004000
Loading map...
Location: 00/04-20-043-04W5/0
Location Alias: 00/04-20-43-04 W5M
Location Alias 2: 00/04-20-043-04 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 04
Section: 20
County/Municipality: Ponoka County
Well Name: TAC HZ WILSONCK 4-20-43-4
Operator Name: Tamarack Acquisition Corp.
License Number: 0474466
License Date: 2015-02-02
License Status: Issued
Spud Date: 2015-06-08
Final Drill Date: 2015-06-18
Well Total Depth: 4677.00 m
Surface Hole Latitude: 52.741488
Surface Hole Longitude: -114.564374

For data sources see[1][2]

Well History

Date Event
2015-02-02 Obtained License
2015-06-10 Surface Casing Operation Performed
2015-06-11 Direction Drilling Operation Performed - Deviate
2015-06-12 Direction Drilling Operation Performed - Horizontal
2015-06-18 Finished Drilling
2015-06-18 Well Log Performed
2015-06-18 Well Mode changed to Drilled and Cased
2015-06-21 Production Casing Operation Performed
2015-06-22 Rig Released
2015-06-28 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-29 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-01 Well Began Production
2015-07-01 Well Fluid changed to Crude Oil
2015-07-01 Well Mode changed to Flowing
2015-09-24 Well Fluid changed to Crude Oil
2015-09-24 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-06-08 Excalibur Drilling Ltd. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-06-11 867.20 Deviate (5 - 79 degrees)
2015-06-12 1881.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-06-28 Multi-Stage Fracture 4658.70 4658.80 0
2015-06-28 Multi-Stage Fracture 3971.90 3972.00 0
2015-06-28 Multi-Stage Fracture 3897.90 3898.00 0
2015-06-28 Multi-Stage Fracture 3824.00 3824.10 0
2015-06-28 Multi-Stage Fracture 3750.20 3750.30 0
2015-06-28 Multi-Stage Fracture 3690.10 3690.20 0
2015-06-28 Multi-Stage Fracture 3616.20 3616.30 0
2015-06-28 Multi-Stage Fracture 3542.30 3542.40 0
2015-06-28 Multi-Stage Fracture 3468.40 3468.50 0
2015-06-28 Multi-Stage Fracture 3394.40 3394.50 0
2015-06-28 Multi-Stage Fracture 3334.20 3334.30 0
2015-06-28 Multi-Stage Fracture 4609.60 4609.70 0
2015-06-28 Multi-Stage Fracture 3260.40 3260.50 0
2015-06-28 Multi-Stage Fracture 3186.50 3186.60 0
2015-06-28 Multi-Stage Fracture 3112.50 3112.60 0
2015-06-28 Multi-Stage Fracture 3038.60 3038.70 0
2015-06-28 Multi-Stage Fracture 2978.50 2978.60 0
2015-06-28 Multi-Stage Fracture 2906.50 2906.60 0
2015-06-28 Multi-Stage Fracture 2832.60 2832.70 0
2015-06-29 Multi-Stage Fracture 2758.70 2758.80 0
2015-06-29 Multi-Stage Fracture 2684.80 2684.90 0
2015-06-29 Multi-Stage Fracture 2624.80 2624.90 0
2015-06-28 Multi-Stage Fracture 4535.70 4535.80 0
2015-06-29 Multi-Stage Fracture 2550.90 2551.00 0
2015-06-29 Multi-Stage Fracture 2477.00 2477.10 0
2015-06-29 Multi-Stage Fracture 2403.10 2403.20 0
2015-06-29 Multi-Stage Fracture 2329.20 2329.30 0
2015-06-29 Multi-Stage Fracture 2269.10 2269.20 0
2015-06-29 Multi-Stage Fracture 2183.30 2183.40 0
2015-06-29 Multi-Stage Fracture 2081.30 2081.40 0
2015-06-29 Multi-Stage Fracture 1987.30 1987.40 0
2015-06-28 Multi-Stage Fracture 4387.90 4388.00 0
2015-06-28 Multi-Stage Fracture 4327.80 4327.90 0
2015-06-28 Multi-Stage Fracture 4253.80 4253.90 0
2015-06-28 Multi-Stage Fracture 4179.80 4179.90 0
2015-06-28 Multi-Stage Fracture 4106.00 4106.10 0
2015-06-28 Multi-Stage Fracture 4032.00 4032.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-06-28 2015-06-29 1,621 5,994 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen 7727-37-9 100 1.9646 N/A
Water Not Available 100 84.1907 N/A
20/40 Sanjel Crystalline Silica 14808-60-7 100 13.5859 N/A
B-1008 Sanjel Bactericide/Biocide BNPD 52-51-7 100 0.0087 N/A
Methyl Alcohol 67-56-1 100 0.0087 N/A
SCC-1L Sanjel Clay Control No hazardous ingredients Not Available 100 0.166 N/A
LDP-F-1915 Sanjel Friction Reducer Alcohols. C11-14 iso. C13-rich. ethoxylated 78330-21-9 100 0.0653 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0653 N/A
Non-Hazardous Ingredients Not Available 100 0.0653 N/A
NE-5 Sanjel Surfactant Alkyl benzenesulfonic acid 68584-22-5 100 0.0838 N/A
Diethylenetriamine 111-40-0 100 0.0838 N/A
Isopropyl Alcohol 67-63-0 100 0.0838 N/A
Non-Hazardous Ingredients Not Available 100 0.0838 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-06-28 2015-06-29 Surface Water - Runoff 194
2015-06-28 2015-06-29 Surface Water - Runoff 2447
2015-06-28 2015-06-29 Surface Water - River 2441
2015-06-28 2015-06-29 Surface Water - Lake 912

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2929 0.0 0.0 0.0
2016 8572 0.0 0.0 0.0
2017 8600 0.0 0.0 0.0
2018 8418 0.0 0.0 0.0
2019 8718 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-22 No Incident Encountered 0.00 0.00
2015-07-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References