X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435041106000

Well Details

Well ID: 0435041106000
Loading map...
Location: 00/06-11-043-04W5/0
Location Alias: 00/06-11-43-04 W5M
Location Alias 2: 00/06-11-043-04 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 04
Section: 11
County/Municipality: Ponoka County
Well Name: JOURNEY PEMBINA 6-11-43-4
Operator Name: Journey Energy Inc.
License Number: 0436929
License Date: 2011-09-19
License Status: Amended
Spud Date: 2011-12-06
Final Drill Date: 2012-01-03
Well Total Depth: 3398.00 m
Surface Hole Latitude: 52.701875
Surface Hole Longitude: -114.475680

For data sources see[1][2]

Well History

Date Event
2011-09-19 Obtained License
2011-12-06 Lost Circulation Occurred
2011-12-08 Surface Casing Operation Performed
2011-12-13 Direction Drilling Operation Performed - Horizontal
2011-12-17 Intermediate Casing Operation Performed
2011-12-17 Well Log Performed
2012-01-03 Finished Drilling
2012-01-03 Well Mode changed to Drilled and Cased
2012-01-09 Liner Casing Operation Performed
2012-01-11 Rig Released
2012-01-13 Perforation Treatment Performed - Open-Hole Completion
2012-01-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-10 Well Began Production
2012-02-10 Well Fluid changed to Gas
2012-02-10 Well Mode changed to Flowing
2014-04-01 Well Fluid changed to Gas
2014-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-13 1924.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-13 Open Hole/Barefoot Completion 3320.00 3398.00 0
2012-01-25 Multi-Stage Fracture 2278.80 2278.90 0
2012-01-17 Multi-Stage Fracture 3310.70 3310.80 0
2012-01-17 Multi-Stage Fracture 3210.60 3210.70 0
2012-01-18 Multi-Stage Fracture 3015.00 3015.10 0
2012-01-25 Multi-Stage Fracture 2880.60 2880.70 0
2012-01-25 Multi-Stage Fracture 2753.10 2753.20 0
2012-01-25 Multi-Stage Fracture 2626.70 2626.80 0
2012-01-25 Multi-Stage Fracture 2488.00 2488.10 0
2012-01-25 Multi-Stage Fracture 2363.70 2363.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7604 0.0 0.0 0.0
2013 8615 0.0 0.0 0.0
2014 8519 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8747 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8544 0.0 0.0 0.0
2020 2167 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-12-06 Lost Circulation 104.00 104.00

For data sources see[7]

References