X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435040901000

Well Details

Well ID: 0435040901000
Loading map...
Location: 00/01-09-043-04W5/0
Location Alias: 00/01-09-43-04 W5M
Location Alias 2: 00/01-09-043-04 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 04
Section: 09
County/Municipality: Ponoka County
Well Name: TQN ET AL HZ WILSONCK 1-9-43-4
Operator Name: TAQA North Ltd.
License Number: 0435607
License Date: 2011-07-28
License Status: Issued
Spud Date: 2011-08-17
Final Drill Date: 2011-09-01
Well Total Depth: 3224.00 m
Surface Hole Latitude: 52.685455
Surface Hole Longitude: -114.536963

For data sources see[1][2]

Well History

Date Event
2011-07-28 Obtained License
2011-08-19 Surface Casing Operation Performed
2011-08-22 Direction Drilling Operation Performed - Deviate
2011-08-23 Direction Drilling Operation Performed - Horizontal
2011-08-24 Intermediate Casing Operation Performed
2011-08-29 Well Log Performed
2011-08-31 Liner Casing Operation Performed
2011-09-01 Finished Drilling
2011-09-01 Rig Released
2011-09-01 Well Mode changed to Drilled and Cased
2011-10-04 Well Log Performed
2011-11-01 Well Began Production
2011-11-01 Well Fluid changed to Crude Oil
2011-11-01 Well Mode changed to Flowing
2011-11-02 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-09 Well Log Performed
2018-11-01 Well Fluid changed to Crude Oil
2018-11-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-22 1243.00 Deviate (5 - 79 degrees)
2011-08-23 1831.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-02 Multi-Stage Fracture 3176.40 3224.00 0
2011-11-04 Multi-Stage Fracture 2253.80 2345.00 0
2011-11-04 Multi-Stage Fracture 2145.50 2252.20 0
2011-11-06 Multi-Stage Fracture 2052.80 2143.90 0
2011-11-06 Multi-Stage Fracture 1946.50 2051.20 0
2011-11-06 Multi-Stage Fracture 1856.00 1944.90 0
2011-11-02 Multi-Stage Fracture 3055.10 3157.50 0
2011-11-02 Multi-Stage Fracture 2947.90 3053.50 0
2011-11-02 Multi-Stage Fracture 2854.80 2946.40 0
2011-11-03 Multi-Stage Fracture 2746.70 2853.20 0
2011-11-03 Multi-Stage Fracture 2654.70 2745.10 0
2011-11-03 Multi-Stage Fracture 2547.10 2653.10 0
2011-11-04 Multi-Stage Fracture 2453.80 2545.50 0
2011-11-04 Multi-Stage Fracture 2346.60 2452.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 73 0.0 0.0 0.0
2012 8647 0.0 0.0 0.0
2013 7854 0.0 0.0 0.0
2014 8144 0.0 0.0 0.0
2015 7915 0.0 0.0 0.0
2016 8742 0.0 0.0 0.0
2017 8731 0.0 0.0 0.0
2018 8713 0.0 0.0 0.0
2019 7905 0.0 0.0 0.0
2020 1615 0.0 0.0 0.0

For data sources see[6]

References