If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435020601030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.671802,"lon":-114.292834,"icon":""}]} |
Location: 03/01-06-043-02W5/0 | |
Location Alias: 03/01-06-43-02 W5M | |
Location Alias 2: 03/01-06-043-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 02 | |
Section: 06 | |
County/Municipality: Ponoka County | |
Well Name: VELVET HZ WROSES 1-6-43-2 | |
Operator Name: Velvet Energy Ltd. | |
License Number: 0445661 | |
License Date: 2012-05-03 | |
License Status: Issued | |
Spud Date: 2012-09-01 | |
Final Drill Date: 2012-09-12 | |
Well Total Depth: 3395.00 m | |
Surface Hole Latitude: 52.671802 | |
Surface Hole Longitude: -114.292834 |
Date | Event |
---|---|
2012-05-03 | Obtained License |
2012-09-03 | Surface Casing Operation Performed |
2012-09-06 | Direction Drilling Operation Performed - Deviate |
2012-09-07 | Direction Drilling Operation Performed - Horizontal |
2012-09-09 | Intermediate Casing Operation Performed |
2012-09-09 | Well Log Performed |
2012-09-12 | Finished Drilling |
2012-09-12 | Well Log Performed |
2012-09-12 | Well Mode changed to Drilled and Cased |
2012-09-15 | Production Casing Operation Performed |
2012-09-16 | Rig Released |
2012-09-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-24 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-01 | Well Began Production |
2012-10-01 | Well Fluid changed to Crude Oil |
2012-10-01 | Well Mode changed to Flowing |
2015-05-01 | Well Fluid changed to Crude Oil |
2015-05-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-01 | Beaver Drilling Ltd. | 11 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-06 | 1636.50 | Deviate (5 - 79 degrees) |
2012-09-07 | 2025.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-24 | Open Hole/Barefoot Completion | 3390.00 | 3395.00 | 0 |
2012-09-24 | Multi-Stage Fracture | 2982.30 | 2982.40 | 0 |
2012-09-24 | Multi-Stage Fracture | 2940.30 | 2940.40 | 0 |
2012-09-25 | Multi-Stage Fracture | 2885.70 | 2885.80 | 0 |
2012-09-25 | Multi-Stage Fracture | 2843.20 | 2843.30 | 0 |
2012-09-25 | Multi-Stage Fracture | 2799.90 | 2800.00 | 0 |
2012-09-25 | Multi-Stage Fracture | 2744.20 | 2744.30 | 0 |
2012-09-25 | Multi-Stage Fracture | 2702.50 | 2702.60 | 0 |
2012-09-25 | Multi-Stage Fracture | 2660.20 | 2660.30 | 0 |
2012-09-25 | Multi-Stage Fracture | 2606.80 | 2606.90 | 0 |
2012-09-25 | Multi-Stage Fracture | 2565.60 | 2565.70 | 0 |
2012-09-24 | Multi-Stage Fracture | 3368.00 | 3368.10 | 0 |
2012-09-25 | Multi-Stage Fracture | 2522.40 | 2522.50 | 0 |
2012-09-25 | Multi-Stage Fracture | 2468.00 | 2468.10 | 0 |
2012-09-25 | Multi-Stage Fracture | 2425.50 | 2425.60 | 0 |
2012-09-26 | Multi-Stage Fracture | 2224.50 | 2224.60 | 0 |
2012-09-26 | Multi-Stage Fracture | 2167.60 | 2167.70 | 0 |
2012-09-26 | Multi-Stage Fracture | 2111.90 | 2112.00 | 0 |
2012-09-24 | Multi-Stage Fracture | 3306.50 | 3306.60 | 0 |
2012-09-24 | Multi-Stage Fracture | 3363.60 | 3363.70 | 0 |
2012-09-24 | Multi-Stage Fracture | 3208.80 | 3208.90 | 0 |
2012-09-24 | Multi-Stage Fracture | 3165.30 | 3165.40 | 0 |
2012-09-24 | Multi-Stage Fracture | 3122.40 | 3122.50 | 0 |
2012-09-24 | Multi-Stage Fracture | 3080.30 | 3080.40 | 0 |
2012-09-24 | Multi-Stage Fracture | 3024.70 | 3024.80 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2029 | 0.0 | 0.0 | 0.0 |
2013 | 8427 | 0.0 | 0.0 | 0.0 |
2014 | 7957 | 0.0 | 0.0 | 0.0 |
2015 | 8246 | 0.0 | 0.0 | 0.0 |
2016 | 8508 | 0.0 | 0.0 | 0.0 |
2017 | 7984 | 0.0 | 0.0 | 0.0 |
2018 | 8666 | 0.0 | 0.0 | 0.0 |
2019 | 8467 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-16 | No Incident Encountered | 0.00 | 0.00 |
2012-09-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]