X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435020116000

Well Details

Well ID: 0435020116000
Loading map...
Location: 00/16-01-043-02W5/0
Location Alias: 00/16-01-43-02 W5M
Location Alias 2: 00/16-01-043-02 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 02
Section: 01
County/Municipality: Ponoka County
Well Name: NAL HOMRIM 16-1-43-2
Operator Name: NAL Resources Limited
License Number: 0268884
License Date: 2002-03-25
License Status: Issued
Spud Date: 2002-03-30
Final Drill Date: 2002-04-04
Well Total Depth: 1905.00 m
Surface Hole Latitude: 52.680294
Surface Hole Longitude: -114.151939

For data sources see[1][2]

Well History

Date Event
2002-03-25 Obtained License
2002-04-01 Surface Casing Operation Performed
2002-04-04 Finished Drilling
2002-04-04 Well Log Performed
2002-04-05 Production Casing Operation Performed
2002-04-05 Well Log Performed
2002-04-06 Rig Released
2002-04-06 Well Mode changed to Drilled and Cased
2002-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-18 Perforation Treatment Performed - Jet Perforation
2002-06-18 Well Log Performed
2002-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-19 Plug Back Performed
2002-06-19 Well Mode changed to Abandoned Zone
2002-06-20 Perforation Treatment Performed - Jet Perforation
2002-06-20 Well Log Performed
2002-06-21 Perforation Treatment Performed - Fractured
2002-06-29 Perforation Treatment Performed - Fractured
2008-07-16 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-06-18 Perforation 1861.00 1862.00 13
2002-06-29 Fracture 1822.50 1830.00 0
2002-06-18 Perforation 1863.30 1869.50 13
2002-06-18 Perforation 1872.00 1875.00 13
2002-06-18 Perforation 1878.50 1880.50 13
2002-06-18 Acid Treatment 1861.00 1880.50 0
2002-06-19 Packing Device Capped w/Cement 1851.00 1859.00 0
2002-06-20 Perforation 1822.50 1826.00 17
2002-06-20 Perforation 1826.00 1830.00 17
2002-06-21 Fracture 1822.50 1830.00 0

For data sources see[4]



References