X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435013215000

Well Details

Well ID: 0435013215000
Loading map...
Location: 00/15-32-043-01W5/0
Location Alias: 00/15-32-43-01 W5M
Location Alias 2: 00/15-32-043-01 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 01
Section: 32
County/Municipality: Ponoka County
Well Name: CVE PEMBINA 15-32-43-1
Operator Name: Cenovus Energy Inc.
License Number: 0019638
License Date: 1960-09-06
License Status: Issued
Spud Date: 1960-09-10
Final Drill Date: 1960-10-12
Well Total Depth: 2448.50 m
Surface Hole Latitude: 52.754279
Surface Hole Longitude: -114.107508

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-09-06 Obtained License
1960-10-12 Finished Drilling
1960-10-12 Well Mode changed to Drilled and Cased
1960-10-14 Production Casing Operation Performed
1960-10-17 Perforation Treatment Performed - Jet Perforation
1960-10-25 Well Began Production
1960-10-25 Well Fluid changed to Crude Oil
1960-10-25 Well Mode changed to Flowing
1961-05-04 Well Fluid changed to Crude Oil
1961-05-04 Well Mode changed to Suspended
1966-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-06-29 Perforation Treatment Performed - Selective Jet Perforations
1966-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-01-06 Well Fluid changed to Gas
1967-01-06 Well Mode changed to Flowing
1991-02-18 Well Log Performed
1993-06-22 Well Log Performed
1993-08-12 Well Fluid changed to Crude Oil
1993-08-12 Well Mode changed to Flowing
1994-09-20 Well Log Performed
1995-08-10 Well Log Performed
1995-08-13 Well Log Performed
1995-08-28 Perforation Treatment Performed - Cement Squeeze
1995-08-31 Well Log Performed
1999-04-27 Well Log Performed
1999-06-16 Well Log Performed
1999-06-18 Well Log Performed
1999-07-10 Well Log Performed
1999-10-12 Well Fluid changed to Crude Oil
1999-10-12 Well Mode changed to Pumping
2000-10-03 Perforation Treatment Performed - Jet Perforation
2000-10-03 Well Log Performed
2000-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-10-17 Perforation 2422.90 2424.70 3
1966-06-29 Selective Jet Perforations 2271.70 2272.30 0
1966-06-29 Selective Jet Perforations 2272.90 2273.50 0
1966-06-29 Selective Jet Perforations 2274.10 2274.70 0
1966-06-29 Selective Jet Perforations 2275.30 2275.90 0
1966-06-29 Selective Jet Perforations 2276.60 2277.20 0
1966-06-29 Selective Jet Perforations 2277.80 2278.40 0
1966-06-29 Selective Jet Perforations 2279.00 2279.60 0
1966-06-29 Selective Jet Perforations 2280.20 2280.80 0
1966-06-29 Selective Jet Perforations 2281.40 2282.00 0
1966-06-29 Selective Jet Perforations 2282.60 2283.30 0
1966-01-21 Packing Device Capped w/Cement 2405.80 2417.70 0
1966-06-29 Selective Jet Perforations 2283.90 2284.50 0
1966-06-29 Selective Jet Perforations 2285.10 2285.70 0
1966-06-29 Selective Jet Perforations 2286.30 2286.90 0
1966-06-29 Selective Jet Perforations 2287.50 2288.10 0
1966-06-29 Selective Jet Perforations 2288.70 2289.40 0
1966-06-29 Selective Jet Perforations 2290.00 2290.60 0
1966-06-29 Selective Jet Perforations 2291.20 2291.80 0
1966-06-29 Selective Jet Perforations 2292.40 2293.00 0
1966-06-29 Selective Jet Perforations 2293.60 2294.20 0
1966-06-29 Selective Jet Perforations 2294.80 2295.10 0
1966-06-29 Selective Jet Perforations 2263.10 2263.70 0
1966-07-05 Acid Treatment 2263.10 2295.10 0
1995-08-28 Cement Squeeze 2280.20 2295.10 0
2000-10-03 Perforation 2257.50 2262.00 17
2000-10-04 Acid Treatment 2257.50 2262.00 0
1966-06-29 Selective Jet Perforations 2264.40 2265.00 0
1966-06-29 Selective Jet Perforations 2265.60 2266.20 0
1966-06-29 Selective Jet Perforations 2266.80 2267.40 0
1966-06-29 Selective Jet Perforations 2268.00 2268.60 0
1966-06-29 Selective Jet Perforations 2269.20 2269.80 0
1966-06-29 Selective Jet Perforations 2270.50 2271.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 357 0.0 0.0 0.0
1970 4536 0.0 0.0 0.0
1971 6432 0.0 0.0 0.0
1972 7787 0.0 0.0 0.0
1973 8376 0.0 0.0 0.0
1974 4249 0.0 0.0 0.0
1975 6917 0.0 0.0 0.0
1976 7724 0.0 0.0 0.0
1977 6348 0.0 0.0 0.0
1978 4223 0.0 0.0 0.0
1979 5043 0.0 0.0 0.0
1980 4773 0.0 0.0 0.0
1981 5311 0.0 0.0 0.0
1982 5619 0.0 0.0 0.0
1983 8320 0.0 0.0 0.0
1984 8485 0.0 0.0 0.0
1985 7308 0.0 0.0 0.0
1986 8486 0.0 0.0 0.0
1987 8425 0.0 0.0 0.0
1988 8476 0.0 0.0 0.0
1989 8744 0.0 0.0 0.0
1990 8400 0.0 0.0 0.0
1991 7562 0.0 0.0 0.0
1992 8367 0.0 0.0 0.0
1993 7918 0.0 0.0 0.0
1994 8056 0.0 0.0 0.0
1995 7840 0.0 0.0 0.0
1996 8201 0.0 0.0 0.0
1997 8370 0.0 0.0 0.0
1998 8066 0.0 0.0 0.0
1999 7850 0.0 0.0 0.0
2000 8383 0.0 0.0 0.0
2001 8623 0.0 0.0 0.0
2002 8599 0.0 0.0 0.0
2003 8107 0.0 0.0 0.0
2004 8665 0.0 0.0 0.0
2005 8559 0.0 0.0 0.0
2006 8063 0.0 0.0 0.0
2007 7779 0.0 0.0 0.0
2008 8686 0.0 0.0 0.0
2009 8428 0.0 0.0 0.0
2010 8127 0.0 0.0 0.0
2011 7445 0.0 0.0 0.0
2012 8494 0.0 0.0 0.0
2013 8258 0.0 0.0 0.0
2014 8364 0.0 0.0 0.0
2015 7902 0.0 0.0 0.0
2016 8077 0.0 0.0 0.0
2017 8012 0.0 0.0 0.0
2018 8649 0.0 0.0 0.0
2019 7677 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References