X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435012903000

Well Details

Well ID: 0435012903000
Loading map...
Location: 00/03-29-043-01W5/0
Location Alias: 00/03-29-43-01 W5M
Location Alias 2: 00/03-29-043-01 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 01
Section: 29
County/Municipality: Ponoka County
Well Name: CVE PEMBINA 3-29-43-1
Operator Name: Cenovus Energy Inc.
License Number: 0005522
License Date: 1952-10-20
License Status: Issued
Spud Date: 1952-10-25
Final Drill Date: 1953-03-21
Well Total Depth: 2738.00 m
Surface Hole Latitude: 52.728980
Surface Hole Longitude: -114.113311

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-10-20 Obtained License
1952-11-27 Drill Stem Test Performed
1952-12-01 Drill Stem Test Performed
1952-12-04 Drill Stem Test Performed
1953-01-08 Drill Stem Test Performed
1953-01-28 Drill Stem Test Performed
1953-02-02 Drill Stem Test Performed
1953-02-03 Drill Stem Test Performed
1953-02-04 Drill Stem Test Performed
1953-02-05 Drill Stem Test Performed
1953-02-07 Drill Stem Test Performed
1953-02-08 Drill Stem Test Performed
1953-02-10 Drill Stem Test Performed
1953-02-13 Drill Stem Test Performed
1953-02-15 Drill Stem Test Performed
1953-02-17 Drill Stem Test Performed
1953-02-21 Drill Stem Test Performed
1953-02-22 Drill Stem Test Performed
1953-02-25 Drill Stem Test Performed
1953-02-26 Drill Stem Test Performed
1953-03-01 Drill Stem Test Performed
1953-03-21 Finished Drilling
1953-03-21 Well Mode changed to Drilled and Cased
1953-03-29 Perforation Treatment Performed - Jet Perforation
1953-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-06-12 Liner Casing Operation Performed
1953-06-12 Perforation Treatment Performed - Cement Squeeze
1953-06-19 Perforation Treatment Performed - Jet Perforation
1953-07-12 Well Began Production
1953-07-12 Well Fluid changed to Crude Oil
1953-07-12 Well Mode changed to Flowing
1955-06-09 Perforation Treatment Performed - Jet Perforation
1955-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1955-06-16 Drill Stem Test Performed
1955-06-17 Perforation Treatment Performed - Acid Wash - No Pressure
1956-12-06 Well Fluid changed to Crude Oil
1956-12-06 Well Mode changed to Suspended
1960-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-06-18 Perforation Treatment Performed - Jet Perforation
1960-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-02-03 Well Fluid changed to Gas
1961-02-03 Well Mode changed to Flowing
1988-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-01-06 Plug Back Performed
1988-01-06 Well Fluid changed to Gas
1988-01-06 Well Mode changed to Abandoned Zone
1988-01-23 Perforation Treatment Performed - Jet Perforation
1988-01-23 Well Log Performed
1988-01-25 Perforation Treatment Performed - Jet Perforation
1988-01-25 Well Log Performed
1988-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-11 Perforation Treatment Performed - Cement Squeeze
1995-04-24 Well Log Performed
1995-06-09 Well Fluid changed to Crude Oil
1995-06-09 Well Mode changed to Flowing
1995-10-28 Well Fluid changed to Crude Oil
1995-10-28 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-03-29 Perforation 2377.40 2385.10 13
1960-06-22 Acid Treatment 2305.50 2329.90 0
1988-01-06 Packing Device Capped w/Cement 2223.90 2233.00 0
1988-01-23 Perforation 1806.70 1807.00 13
1988-01-23 Perforation 1753.10 1754.00 13
1988-01-25 Perforation 1787.00 1787.80 13
1988-01-26 Acid Treatment 1787.00 1787.80 0
1988-02-11 Cement Squeeze 1753.10 1807.00 0
1953-04-02 Acid Treatment 2377.40 2385.10 0
1953-06-12 Cement Squeeze 2377.40 2385.10 0
1953-06-19 Perforation 2432.30 2432.90 13
1955-06-09 Perforation 2429.00 2430.20 13
1955-06-11 Packing Device Capped w/Cement 2431.40 2431.40 0
1955-06-17 Acid Wash 2429.00 2430.20 0
1960-06-18 Packing Device Capped w/Cement 2422.90 2422.90 0
1960-06-18 Perforation 2305.50 2329.90 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 8301 0.0 0.0 0.0
1970 8740 0.0 0.0 0.0
1971 7844 0.0 0.0 0.0
1972 8655 0.0 0.0 0.0
1973 8344 0.0 0.0 0.0
1974 8249 0.0 0.0 0.0
1975 7887 0.0 0.0 0.0
1976 6638 0.0 0.0 0.0
1977 8281 0.0 0.0 0.0
1978 8071 0.0 0.0 0.0
1979 8528 0.0 0.0 0.0
1980 8600 0.0 0.0 0.0
1981 8550 0.0 0.0 0.0
1982 7943 0.0 0.0 0.0
1983 8666 0.0 0.0 0.0
1984 8337 0.0 0.0 0.0
1985 48 0.0 0.0 0.0
1995 3404 0.0 0.0 0.0
1996 7689 0.0 0.0 0.0
1997 4567 0.0 0.0 0.0
1998 7183 0.0 0.0 0.0
1999 7939 0.0 0.0 0.0
2000 8306 0.0 0.0 0.0
2001 8273 0.0 0.0 0.0
2002 8200 0.0 0.0 0.0
2003 7719 0.0 0.0 0.0
2004 8711 0.0 0.0 0.0
2005 8079 0.0 0.0 0.0
2006 8327 0.0 0.0 0.0
2007 4385 0.0 0.0 0.0
2008 8615 0.0 0.0 0.0
2009 7156 0.0 0.0 0.0
2010 4655 0.0 0.0 0.0
2011 7729 0.0 0.0 0.0
2012 7019 0.0 0.0 0.0
2013 7853 0.0 0.0 0.0
2014 8091 0.0 0.0 0.0
2015 1757 0.0 0.0 0.0
2017 8355 0.0 0.0 0.0
2018 8708 0.0 0.0 0.0
2019 7856 0.0 0.0 0.0
2020 2165 0.0 0.0 0.0

For data sources see[5]

References