X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435011811000

Well Details

Well ID: 0435011811000
Loading map...
Location: 00/11-18-043-01W5/0
Location Alias: 00/11-18-43-01 W5M
Location Alias 2: 00/11-18-043-01 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 01
Section: 18
County/Municipality: Ponoka County
Well Name: CALSTAN RIMBEY 11-18-43-1
Operator Name: NAL Resources Limited
License Number: 0015751
License Date: 1958-08-18
License Status: Suspension
Spud Date: 1958-08-25
Final Drill Date: 1958-10-06
Well Total Depth: 2414.00 m
Surface Hole Latitude: 52.707465
Surface Hole Longitude: -114.138052

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-08-18 Obtained License
1958-09-30 Liner Casing Operation Performed
1958-10-06 Finished Drilling
1958-10-06 Well Mode changed to Drilled and Cased
1958-10-07 Perforation Treatment Performed - Open-Hole Completion
1958-10-10 Well Began Production
1958-10-10 Well Fluid changed to Crude Oil
1958-10-10 Well Mode changed to Flowing
1966-09-15 Drill Stem Test Performed
1966-09-21 Perforation Treatment Performed - Cement Squeeze
1966-09-24 Perforation Treatment Performed - Jet Perforation
1966-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-09-09 Well Fluid changed to Crude Oil
1967-09-09 Well Mode changed to Pumping
1967-11-15 Perforation Treatment Performed - Cement Squeeze
1967-11-21 Perforation Treatment Performed - Jet Perforation
1967-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-06-03 Perforation Treatment Performed - Cement Squeeze
1969-06-05 Perforation Treatment Performed - Acid Wash - No Pressure
1969-06-05 Perforation Treatment Performed - Jet Perforation
1970-04-01 Well Fluid changed to Crude Oil
1970-04-01 Well Mode changed to Suspended
1970-06-23 Perforation Treatment Performed - Cement Squeeze
1973-07-21 Perforation Treatment Performed - Jet Perforation
1973-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-07-23 Well Fluid changed to Crude Oil
1973-07-23 Well Mode changed to Flowing
1973-07-31 Well Fluid changed to Crude Oil
1973-07-31 Well Mode changed to Suspended
1973-12-05 Well Fluid changed to Gas
1973-12-05 Well Mode changed to Flowing
1988-02-17 Perforation Treatment Performed - Cement Plug
1988-02-17 Well Fluid changed to Gas
1988-02-17 Well Log Performed
1988-02-17 Well Mode changed to Abandoned Zone
1988-02-19 Well Log Performed
1988-05-13 Perforation Treatment Performed - Jet Perforation
1988-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-14 Perforation Treatment Performed - Cement Squeeze
1988-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-18 Perforation Treatment Performed - Cement Squeeze
1988-05-18 Perforation Treatment Performed - Jet Perforation
1988-05-27 Perforation Treatment Performed - Jet Perforation
1988-05-29 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-10-07 Open Hole/Barefoot Completion 2393.00 2395.10 0
1969-06-05 Acid Wash 2380.20 2381.10 0
1970-06-23 Cement Squeeze 2380.20 2381.10 0
1973-07-21 Perforation 2310.40 2328.70 7
1973-07-23 Acid Treatment 2310.40 2328.70 0
1988-02-17 Cement Plug 2240.50 2252.50 0
1988-05-13 Perforation 1787.00 1787.30 13
1988-05-14 Acid Treatment 1787.00 1787.30 0
1988-05-14 Cement Squeeze 1787.00 1787.30 0
1988-05-18 Perforation 1792.90 1793.20 13
1988-05-18 Acid Treatment 1792.90 1793.20 0
1966-09-21 Cement Squeeze 2296.70 2413.10 0
1988-05-18 Cement Squeeze 1792.90 1793.20 0
1988-05-27 Perforation 1768.00 1785.00 16
1988-05-29 Fracture 1768.00 1785.00 0
1966-09-24 Perforation 2389.00 2390.50 13
1966-10-04 Acid Treatment 2389.00 2390.50 0
1967-11-15 Cement Squeeze 2389.00 2390.50 0
1967-11-21 Perforation 2383.50 2385.10 7
1967-11-22 Acid Treatment 2383.50 2385.10 0
1969-06-03 Cement Squeeze 2383.50 2385.10 0
1969-06-05 Perforation 2380.20 2381.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 3932 0.0 0.0 0.0
1969 2385 0.0 0.0 0.0
1973 572 0.0 0.0 0.0
1974 8318 0.0 0.0 0.0
1975 8181 0.0 0.0 0.0
1976 8565 0.0 0.0 0.0
1977 8239 0.0 0.0 0.0
1978 7418 0.0 0.0 0.0
1979 7939 0.0 0.0 0.0
1980 8378 0.0 0.0 0.0
1981 8524 0.0 0.0 0.0
1982 4277 0.0 0.0 0.0
1985 48 0.0 0.0 0.0

For data sources see[5]

References