X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434281204020

Well Details

Well ID: 0434281204020
Loading map...
Location: 02/04-12-043-28W4/0
Location Alias: 02/04-12-43-28 W4M
Location Alias 2: 02/04-12-043-28 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 28
Section: 12
County/Municipality: Ponoka County
Well Name: BEC 02 FBANK 4-12-43-28
Operator Name: Bonavista Energy Corporation
License Number: 0487422
License Date: 2017-12-20
License Status: Issued
Spud Date: 2018-01-28
Final Drill Date: 2018-02-06
Well Total Depth: 4900.00 m
Surface Hole Latitude: 52.687459
Surface Hole Longitude: -113.899122

For data sources see[1][2]

Well History

Date Event
2017-12-20 Obtained License
2018-01-28 Surface Casing Operation Performed
2018-01-30 Direction Drilling Operation Performed - Deviate
2018-02-01 Direction Drilling Operation Performed - Horizontal
2018-02-01 Well Log Performed
2018-02-02 Intermediate Casing Operation Performed
2018-02-02 Well Log Performed
2018-02-06 Finished Drilling
2018-02-06 Well Log Performed
2018-02-06 Well Mode changed to Drilled and Cased
2018-02-08 Liner Casing Operation Performed
2018-02-09 Perforation Treatment Performed - Open-Hole Completion
2018-02-09 Rig Released
2018-02-12 Well Log Performed
2018-03-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-04 Well Fluid changed to Gas
2018-03-04 Well Mode changed to Testing
2018-03-15 Well Began Production
2018-03-15 Well Fluid changed to Gas
2018-03-15 Well Mode changed to Flowing
2019-04-01 Well Fluid changed to Gas
2019-04-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-28 Savanna Drilling Corp. 631 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-30 428.50 Deviate (5 - 79 degrees)
2018-02-01 1803.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-09 Open Hole/Barefoot Completion 4885.00 4900.00 0
2018-03-02 Multi-Stage Fracture 3955.70 3955.80 0
2018-03-02 Multi-Stage Fracture 3844.40 3844.50 0
2018-03-02 Multi-Stage Fracture 3718.20 3718.30 0
2018-03-02 Multi-Stage Fracture 3596.80 3596.90 0
2018-03-02 Multi-Stage Fracture 3488.70 3488.80 0
2018-03-02 Multi-Stage Fracture 3367.00 3367.10 0
2018-03-02 Multi-Stage Fracture 3247.30 3247.40 0
2018-03-02 Multi-Stage Fracture 3128.10 3128.20 0
2018-03-02 Multi-Stage Fracture 3006.70 3006.80 0
2018-03-02 Multi-Stage Fracture 2885.00 2885.10 0
2018-03-01 Multi-Stage Fracture 4875.60 4875.70 0
2018-03-02 Multi-Stage Fracture 2763.70 2763.80 0
2018-03-02 Multi-Stage Fracture 2641.50 2641.60 0
2018-03-02 Multi-Stage Fracture 2528.80 2528.90 0
2018-03-02 Multi-Stage Fracture 2404.80 2404.90 0
2018-03-02 Multi-Stage Fracture 2291.60 2291.70 0
2018-03-02 Multi-Stage Fracture 2167.30 2167.40 0
2018-03-02 Multi-Stage Fracture 2054.30 2054.40 0
2018-03-02 Multi-Stage Fracture 1927.60 1927.70 0
2018-03-01 Multi-Stage Fracture 4799.40 4799.50 0
2018-03-02 Multi-Stage Fracture 4673.20 4673.30 0
2018-03-02 Multi-Stage Fracture 4559.70 4559.80 0
2018-03-02 Multi-Stage Fracture 4434.60 4434.70 0
2018-03-02 Multi-Stage Fracture 4321.40 4321.50 0
2018-03-02 Multi-Stage Fracture 4194.90 4195.00 0
2018-03-02 Multi-Stage Fracture 4082.10 4082.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-01 2018-03-02 1,664 1,304 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 47.7348 N/A
Water 7732-18-5 100 25.6909 N/A
20/40 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 25.9261 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0027 N/A
Methyl Alcohol 67-56-1 100 0.0027 N/A
Non-Hazardous Ingredients Not Available 100 0.0027 N/A
SVB-1 (Viscoelastic Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.052 N/A
SBL-2 (Buffer) Step Energy Services Buffer Acetic Acid 64-19-7 100 0.0523 N/A
Non-Hazardous Ingredients Not Available 100 0.0523 N/A
SVS-1 (Viscoelastic Surfactant) Step Energy Services Surfactant Proprietary Trade Secret 100 0.5408 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-23 2018-02-25 Surface Water - Runoff 1221

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6850 0.0 0.0 0.0
2019 7781 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-06 No Incident Encountered 0.00 0.00
2018-03-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References