X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434103304003

Well Details

Well ID: 0434103304003
Loading map...
Location: 00/04-33-043-10W4/3
Location Alias: 00/04-33-43-10 W4M
Location Alias 2: 00/04-33-043-10 W4/03
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 10
Section: 33
County/Municipality: Flagstaff County
Well Name: SLE KILLAM 4-33-43-10
Operator Name: SanLing Energy Ltd.
License Number: 0276305
License Date: 2002-11-20
License Status: Abandoned
Spud Date: 2002-12-02
Final Drill Date: 2002-12-04
Well Total Depth: 761.00 m
Surface Hole Latitude: 52.742497
Surface Hole Longitude: -111.405102

For data sources see[1][2]

Well History

Date Event
2002-11-20 Obtained License
2002-12-03 Surface Casing Operation Performed
2002-12-04 Finished Drilling
2002-12-04 Well Mode changed to Drilled and Cased
2002-12-05 Production Casing Operation Performed
2002-12-05 Rig Released
2002-12-05 Well Log Performed
2002-12-21 Perforation Treatment Performed - Jet Perforation
2002-12-22 Well Log Performed
2003-01-20 Perforation Treatment Performed - Jet Perforation
2003-01-27 Perforation Treatment Performed - Jet Perforation
2003-05-23 Perforation Treatment Performed - Jet Perforation
2003-05-27 Well Fluid changed to Gas
2003-05-27 Well Mode changed to Testing
2003-06-08 Perforation Treatment Performed - Jet Perforation
2003-06-09 Well Log Performed
2003-12-12 Well Began Production
2003-12-12 Well Fluid changed to Gas
2003-12-12 Well Mode changed to Flowing
2006-07-22 Well Structure changed to Commingled
2018-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-01-28 Plug Back Performed
2018-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-01-29 Plug Back Performed
2018-01-29 Well Mode changed to Abandoned Zone
2018-01-29 Well Structure changed to Commingled
2018-02-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-12-21 Perforation 733.00 734.00 17
2003-01-20 Perforation 703.00 705.00 17
2003-01-27 Perforation 699.00 701.00 17
2003-05-23 Perforation 645.00 647.00 20
2003-06-08 Perforation 677.50 682.00 20
2018-01-28 Packing Device Capped w/Cement 719.00 727.00 0
2018-01-29 Packing Device Capped w/Cement 659.50 667.50 0
2018-01-29 Packing Device Capped w/Cement 628.50 636.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 304 0.0 0.0 0.0
2004 8464 0.0 0.0 0.0
2005 8647 0.0 0.0 0.0
2006 4285 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2003-01-18 No Incident Encountered 0.00 0.00
2018-01-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References