If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434091203003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.686711,"lon":-111.182226,"icon":""}]} |
Location: 00/03-12-043-09W4/3 | |
Location Alias: 00/03-12-43-09 W4M | |
Location Alias 2: 00/03-12-043-09 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 09 | |
Section: 12 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: CLEO ENERGY KILLAM 3-12-43-9 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0092874 | |
License Date: 1981-10-22 | |
License Status: Issued | |
Spud Date: 1981-10-26 | |
Final Drill Date: 1981-10-29 | |
Well Total Depth: 802.00 m | |
Surface Hole Latitude: 52.686711 | |
Surface Hole Longitude: -111.182226 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-10-22 | Obtained License |
1981-10-26 | Lost Circulation Occurred |
1981-10-28 | Drill Stem Test Performed |
1981-10-29 | Finished Drilling |
1981-10-29 | Well Mode changed to Drilled and Cased |
1981-10-30 | Production Casing Operation Performed |
1981-12-15 | Perforation Treatment Performed - Jet Perforation |
1981-12-16 | Perforation Treatment Performed - Jet Perforation |
1988-05-03 | Well Log Performed |
1988-05-04 | Perforation Treatment Performed - Jet Perforation |
2004-10-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-10-02 | Plug Back Performed |
2004-10-03 | Perforation Treatment Performed - Jet Perforation |
2004-10-03 | Well Log Performed |
2004-10-19 | Perforation Treatment Performed - Fractured |
2005-07-12 | Well Log Performed |
2005-07-22 | Well Began Production |
2005-07-22 | Well Fluid changed to Gas |
2005-07-22 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-12-15 | Perforation | 701.00 | 703.50 | 13 |
1981-12-16 | Perforation | 695.00 | 698.00 | 13 |
1988-05-04 | Perforation | 746.00 | 748.50 | 13 |
2004-10-02 | Packing Device Capped w/Cement | 727.00 | 735.00 | 0 |
2004-10-02 | Packing Device Capped w/Cement | 677.00 | 685.00 | 0 |
2004-10-03 | Perforation | 654.00 | 658.00 | 17 |
2004-10-19 | Fracture | 654.00 | 658.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 3230 | 0.0 | 0.0 | 0.0 |
2006 | 8359 | 0.0 | 0.0 | 0.0 |
2007 | 7344 | 0.0 | 0.0 | 0.0 |
2008 | 7254 | 0.0 | 0.0 | 0.0 |
2009 | 8755 | 0.0 | 0.0 | 0.0 |
2010 | 8700 | 0.0 | 0.0 | 0.0 |
2011 | 8500 | 0.0 | 0.0 | 0.0 |
2012 | 8714 | 0.0 | 0.0 | 0.0 |
2013 | 8674 | 0.0 | 0.0 | 0.0 |
2014 | 8080 | 0.0 | 0.0 | 0.0 |
2015 | 8695 | 0.0 | 0.0 | 0.0 |
2016 | 8250 | 0.0 | 0.0 | 0.0 |
2017 | 8276 | 0.0 | 0.0 | 0.0 |
2018 | 8596 | 0.0 | 0.0 | 0.0 |
2019 | 4963 | 0.0 | 0.0 | 0.0 |
2020 | 1783 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1981-10-26 | Lost Circulation | 80.00 | 80.00 |
For data sources see[6]