X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434040304000

Well Details

Well ID: 0434040304000
Loading map...
Location: 00/04-03-043-04W4/0
Location Alias: 00/04-03-43-04 W4M
Location Alias 2: 00/04-03-043-04 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 04
Section: 03
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN 4B RIBSTONE 4-3-43-4
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0274941
License Date: 2002-10-22
License Status: Suspension
Spud Date: 2002-11-28
Final Drill Date: 2002-11-30
Well Total Depth: 746.00 m
Surface Hole Latitude: 52.670630
Surface Hole Longitude: -110.510912

For data sources see[1][2]

Well History

Date Event
2002-10-22 Obtained License
2002-11-29 Direction Drilling Operation Performed - Deviate
2002-11-29 Surface Casing Operation Performed
2002-11-30 Finished Drilling
2002-11-30 Well Log Performed
2002-12-01 Production Casing Operation Performed
2002-12-01 Rig Released
2002-12-01 Well Mode changed to Drilled and Cased
2002-12-16 Perforation Treatment Performed - Jet Perforation
2002-12-16 Well Log Performed
2002-12-18 Well Fluid changed to Crude Oil
2002-12-18 Well Mode changed to Potential
2002-12-19 Perforation Treatment Performed - Fractured
2003-01-25 Well Began Production
2003-01-25 Well Fluid changed to Crude Oil
2003-01-25 Well Mode changed to Pumping
2005-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-23 Plug Back Performed
2005-06-29 Perforation Treatment Performed - Jet Perforation
2005-07-10 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-11-29 272.20 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-12-16 Perforation 719.00 723.50 13
2002-12-19 Fracture 698.50 699.50 0
2005-06-23 Packing Device Capped w/Cement 532.00 728.50 0
2005-06-29 Perforation 718.00 721.00 13
2005-07-10 Fracture 718.00 721.00 0
2002-12-16 Perforation 714.00 719.00 13
2002-12-16 Perforation 711.50 712.50 13
2002-12-16 Perforation 704.50 705.50 13
2002-12-16 Perforation 698.50 699.50 13
2002-12-19 Fracture 719.00 723.50 0
2002-12-19 Fracture 714.00 719.00 0
2002-12-19 Fracture 711.50 712.50 0
2002-12-19 Fracture 704.50 705.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 6995 0.0 0.0 0.0
2004 7150 0.0 0.0 0.0
2005 4989 0.0 0.0 0.0
2006 6568 0.0 0.0 0.0
2008 4070 0.0 0.0 0.0
2009 7333 0.0 0.0 0.0
2010 7956 0.0 0.0 0.0
2011 8529 0.0 0.0 0.0
2012 7642 0.0 0.0 0.0
2013 7344 0.0 0.0 0.0
2014 8619 0.0 0.0 0.0
2015 8208 0.0 0.0 0.0
2016 8304 0.0 0.0 0.0
2017 7863 0.0 0.0 0.0
2018 7364 0.0 0.0 0.0
2019 7226 0.0 0.0 0.0
2020 1935 0.0 0.0 0.0

For data sources see[6]

References