If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434021210B00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.691191,"lon":-110.159286,"icon":""}]} |
Location: B0/10-12-043-02W4/0 | |
Location Alias: B0/10-12-43-02 W4M | |
Location Alias 2: B0/10-12-043-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 02 | |
Section: 12 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: TALISMAN CHAUVS 10-12-43-2 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0134456 | |
License Date: 1988-06-21 | |
License Status: Issued | |
Spud Date: 1988-07-10 | |
Final Drill Date: 1988-07-12 | |
Well Total Depth: 686.00 m | |
Surface Hole Latitude: 52.691191 | |
Surface Hole Longitude: -110.159286 |
Date | Event |
---|---|
1988-06-21 | Obtained License |
1988-07-10 | Surface Casing Operation Performed |
1988-07-12 | Finished Drilling |
1988-07-12 | Well Log Performed |
1988-07-12 | Well Mode changed to Drilled and Cased |
1988-07-13 | Production Casing Operation Performed |
1988-07-13 | Rig Released |
1988-07-27 | Perforation Treatment Performed - Jet Perforation |
1988-07-27 | Well Log Performed |
1988-08-04 | Well Began Production |
1988-08-04 | Well Fluid changed to Crude Oil |
1988-08-04 | Well Mode changed to Pumping |
1989-12-07 | Well Log Performed |
1989-12-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-12-08 | Perforation Treatment Performed - Jet Perforation |
1989-12-08 | Plug Back Performed |
1989-12-08 | Well Fluid changed to Crude Oil |
1989-12-08 | Well Log Performed |
1989-12-08 | Well Mode changed to Abandoned Zone |
1990-08-09 | Perforation Treatment Performed - Fractured |
1991-08-09 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-07-27 | Perforation | 675.00 | 676.50 | 13 |
1989-12-08 | Packing Device Capped w/Cement | 666.60 | 668.60 | 0 |
1989-12-08 | Perforation | 662.00 | 665.00 | 13 |
1990-08-09 | Fracture | 662.00 | 665.00 | 0 |
1991-08-09 | Fracture | 662.00 | 665.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 1791 | 0.0 | 0.0 | 0.0 |
1989 | 2227 | 0.0 | 0.0 | 0.0 |
For data sources see[5]